Laserfiche WebLink
Description: This project will design and construct a public parking lot on the <br /> transportation corridor between Bernal Avenue and Abbie Street. The project will <br /> replace an existing stabilized gravel parking lot that has a one-way drive isle and <br /> diagonal parking. The new parking lot will be similar to the Firehouse Arts Center <br /> parking lot with a two-way drive isle, ninety-degree parking on each side, walk <br /> path and landscaping. The project will require a 5-to-6-foot retaining wall be built <br /> along the west edge of the railroad corridor, drainage improvements, stormwater <br /> treatment facilities, curb, gutter, new asphalt and striping. <br /> Approximate project completion date: 2020 <br /> Project cost: $2.2 million <br /> % funded by development impact fees: 30% <br /> Source of funding: Downtown Parking In-Lieu and General Fund CIP <br /> Section 2: City Clerk shall certify to the passage of this resolution and enter it into the <br /> book of original resolutions. <br /> PASSED, APPROVED AND ADOPTED by the City Council of the City of Pleasanton at <br /> a regular meeting held on the December 17, 2019. <br /> I, Karen Diaz, City Clerk of the City of Pleasanton, California, certify that the foregoing <br /> resolution was adopted by the City Council at a regular meeting held on the 17th of December <br /> 2019 by the following vote: <br /> Ayes: Councilmembers Brown, Narum, Pentin, Testa, Mayor Thorne <br /> Noes: None <br /> Absent: None <br /> Abstain: None <br /> 1 _LL.:I - <br /> Karen Diaz, City CIO) <br /> Dated: /0/707/1 <br /> APPROVEDVES S TO FORM: <br /> 4V <br /> Daniel Sodergren, City Attorney <br />