Laserfiche WebLink
LAT PULL OUTDOOR FITNESS <br /> Installation Diagram (877) 517-2200 or (719) 488-3812 <br /> support@outdoor-fitness.com <br /> A. Excavate a hole measuring 50*50*50 cms ( 1'7 3/4"as per the drawing. <br /> B. First pour cement into the hole to form a cement layer of 100 mm. Installer should create <br /> a template based on the position of the holes on the equipment and/or position the J-bolts <br /> with do-it-yourself fixing mould and put the bolts into the hole (Refer to the diagram for <br /> space and size).Then pour concrete into the hole assuring that bolts are perpendicular to <br /> and 6.0 - 6.5 centimeters (2 1/2") above the ground surface. After pouring, double check the <br /> position of the anchor bolts against the equipment and make sure the concrete surface is <br /> very flat. Allow concrete to set for 24 hours prior to placing the equipment. <br /> C. When the concrete is hardened;fasten the equipment to the J-bolts with 4 M18 nuts <br /> together with M18 spacers,as illustrated. After installation,check the perpendicularity of the <br /> equipment to ground surface with tolerance less than 1/100. Cover the Anchor bolts with <br /> plastic base dome. <br /> Cement Block Hole (50*50*50) <br /> 90° Optional Fixing Mould <br /> 4-M 18 J-bolts <br /> (60-65 mm above <br /> ground surface) <br /> 27 <br /> crns <br /> 207 in• ches <br /> \ef <br /> M18 <br /> J-Bolts <br /> 1-M18 Nuts <br />