Laserfiche WebLink
CHEST PRESS DOUBLE OUTDOOR FITNESS <br /> Installation Diagram (877) 517-2200 or (719) 488-3812 <br /> support@outdoor-fitness.com <br /> A. Excavate a hole measuring 50*50*50 cms ( 1 '7 3/4") as per the drawing. <br /> B. First pour cement into the hole to form a cement layer of 100 mm. Installer should create a <br /> template based on the position of the holes on the equipment,then position the J-bolts with <br /> the do-it-yourself fixing mould and put the bolts into the hole. (Refer to the diagram below). <br /> C. Pour concrete into the hole assuring that bolts are perpendicular to and 6.0 - 6.5 centimeters <br /> (2 1/2") above the ground surface. After pouring, double check the position of the anchor bolts <br /> against the actual positioning the equipment and make sure the concrete surface is very flat. <br /> Allow concrete to set for 24 hours prior to permenantly placing the equipment. <br /> D. When the concrete is hardened;fasten the equipment to the J-bolts with 4 M18 nuts <br /> together with M18 spacers,as illustrated. After installation,check the perpendicularity of the <br /> equipment to ground surface with tolerance less than 1/100. Cover the Anchor bolts with plas- <br /> tic base dome. <br /> Cement Block Hole (50*50*50) <br /> 90° <br /> Optional Fixing Mould <br /> 4-M18.1-bolts <br /> 0 CP (60-65 mm above <br /> •round surface) <br /> 2)oms <br /> i • 8.26 <br /> \ inches <br /> • M18 <br /> J-Bolts <br /> 1-M18 Nuts <br /> 40 cms <br /> 1'3 <br /> 3/4" <br /> 50 cms <br /> 1'7 3/4" <br />