My WebLink
|
Help
|
About
|
Sign Out
ORD 2199
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2101 - 2200
>
ORD 2199
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:22:26 PM
Creation date
10/23/2019 12:15:59 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
10/15/2019
DESTRUCT DATE
PERMANENT
NOTES
3987 STANLEY BLVD PUD-133
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ordinance No. 2199 <br /> Exhibit A <br /> Page 6 <br /> Wording for these covenants and/or disclosures shall be submitted to the City Attorney for review <br /> and approval before recordation of the final map. <br /> Green Building and Sustainability Measures <br /> 27. PHOTOVOLTAIC AND SOLAR WATER HEATING SYSTEMS: The new residences shall be <br /> constructed to allow for future installation of a photovoltaic (PV) system and a solar water heating <br /> system. The measures shall be shown on the building permit plans for review and approval by the <br /> Director of Community Development prior to building permit issuance. The applicant shall provide <br /> the future owners the necessary information delineating the means by which photovoltaic panels <br /> can be applied to the roof of the new structure covered by this approval. This information shall be <br /> reviewed and approved by the Director of Community Development prior to occupancy of the <br /> units. The applicant shall comply with the following requirements for making the new dwelling <br /> units on the subject site photovoltaic-ready and solar water heating-ready: <br /> a. Electrical conduit and cable pull strings shall be installed from the roof/attic area to the <br /> building's main electrical panels; <br /> b. An area shall be provided near the electrical panel for the installation of an "inverter" <br /> required to convert the direct current output from the photovoltaic panels to alternating <br /> current; <br /> c. Engineer the roof trusses to handle an additional load as determined by a structural <br /> engineer to accommodate the additional weight of a prototypical photovoltaic system <br /> beyond that anticipated for roofing; <br /> d. Plumbing shall be installed for solar-water heating; and <br /> e. Space shall be provided for solar-heating tank. <br /> Construction Practices and Noticing <br /> 28. WORK HOURS: All demolition and construction activities, inspections, plan checking, material <br /> delivery, staff assignment or coordination, etc., shall be limited to the hours of 8 a.m. to 5 p.m., <br /> Monday through Friday. No construction shall be allowed on State or Federal Holidays or <br /> Saturdays or Sundays. The Director of Community Development may allow earlier"start times" or <br /> later "stop times" for specific construction activities, e.g., concrete pouring. All construction <br /> equipment shall meet Department of Motor Vehicles (DMV) noise standards and shall be <br /> equipped with muffling devices. Prior to construction, the hours of construction shall be posted on <br /> site. <br /> 29. CONSTRUCTION PARKING: Campers, trailers, motor homes, or any other similar vehicle are <br /> not allowed on the construction site except when needed as sleeping quarters for a security <br /> guard subject to receipt of a temporary conditional use permit (per PMC 18.116.010.E). <br /> 30. CONSTRUCTION TRAILERS: A construction trailer shall be allowed to be placed on the project <br /> site for daily administration/coordination purposes during the construction period. <br /> 31. CONSTRUCTION AND PARKING MANAGEMENT PLAN: The applicant shall prepare a <br /> construction and parking management plan to address impacts and parking demands during the <br /> construction phase of the project. The construction and parking management plan shall be <br /> subject to review and approval by the City Traffic Engineer and Director of Community <br />
The URL can be used to link to this page
Your browser does not support the video tag.