Laserfiche WebLink
Commissioner Balch asked, and Mr. Luchini confirmed that staff evaluated the traffic and by <br /> capping the restaurant use at 3,349 square feet, the trips generated by the project would be <br /> fewer trips than the TIA would show. <br /> Commissioner Brown asked, with respect to coffee and donut shops whether these would be <br /> different from the restaurant uses that would go into unit A5. <br /> Mr. Luchini responded that a "coffee shop" use going into Suite A5 would not be along the <br /> lines of a Starbucks or Peets or one of the larger chain coffee shops, rather more along the <br /> lines of a diner style restaurant that may happen to serve coffee or have a coffee bar as a side <br /> or ancillary element. <br /> Commissioner Balch asked why coffee/donut/bagel shops had been especially called out <br /> Mr. Luchini confirmed they were specifically called out so that they would be excluded from the <br /> more general restaurant category and could be addressed separately. <br /> Commissioner Balch asked, and Mr. Luchini confirmed that coffee shops, etc. would be <br /> included in the overall square footage envelope for the new commercial building; however, <br /> based on their higher trip generation that could affect the square footage of other uses <br /> proposed within the new commercial building. <br /> Commissioner Balch asked if there were any other high traffic-generating uses within the <br /> restaurant designation that should also be more specifically addressed. <br /> Referencing the TIA, Mr. Luchini noted that it had analyzed the "fast food" category, which is a <br /> different category within the over-arching restaurant category. <br /> Commissioner Balch noted that this went to his exact concern, which is that there could be <br /> large differences in traffic patterns between different types of restaurant uses, like sit-down <br /> versus fast food restaurants, but they still all fall into the restaurant land use category. <br /> Planning Manager Ellen Clark clarified Commissioner Balch's question, whether there is a <br /> more impactful restaurant use other than fast food that should also be called out. Her <br /> understanding is that fast food is one of the highest trip generating restaurant categories, and <br /> there are no other types of restaurant uses that would be more impactful. <br /> Commissioner Balch said the restaurant category between fast food and the restaurant <br /> category which is one impact level below fast food is the restaurant category he is trying to ask <br /> about it, and he suggested calling it "coffee shops" at this point. <br /> Ms. Clark stated coffee shops are a little different because they have a different a.m./p.m. <br /> pattern, so it is not just total daily trips but also the timing of those trips; coffee and donut <br /> shops happen to have a very high a.m. peak trip generation associated with them. Other <br /> restaurant categories have a more balanced trip distribution or may skew to the pm peak. <br /> Commissioner Balch said one of the things he is trying to evaluate is that if restaurants are <br /> coming in for a PUD because it is not initially zoned as such, and the Commission would be <br /> Planning Commission Minutes Page 3 of 19 September 25, 2019 <br />nutes. <br /> Planning Commission <br /> Page 12 of 12 <br /> up to 6-inches in diameter and farther than 8-feet from the tree trunk may be <br /> removed if they are in conflict with the proposed work. Roots that are removed shall <br /> be cleanly cut using a hand saw. <br /> P19-0151 Planning Commission <br /> Page 11 of 12 <br /> for the Project <br /> Arborist to conduct a field inspection prior to building permit issuance to ensure all <br /> recommendations have been properly implemented. The Project Arborist shall certify in writing all <br /> P19-0151 Planning Commission <br /> Page 10 of 12 <br />rotection contractor shall be submitted to the Fire Prevention Bureau for approval; and 2.) Backflow <br /> prevention or connections to the public water mains. <br /> P19-0151 Planning Commission <br /> Page 8 of 12 <br />City will retain the cash <br /> deposit until all work is substantially complete, all areas are stabilized, and all hazards are <br /> mitigated to the satisfaction of the Director of Engineering/City Engineer. <br /> P19-0151 Planning Commission <br /> Page 7 of 12 <br />