Laserfiche WebLink
THE CITY OF <br /> r19 Planning Commission <br /> .pipMeAllr <br /> -h Agenda Report <br /> LEASANTONC October 232019 <br /> Item 8 <br /> SUBJECT: Actions of the Zoning Administrator <br /> P18-0287 and P19-0205, David Morris/Valley Brokers on Main <br /> Applications for the existing residence located at 308 Adams Way for: (1) Administrative <br /> Design Review approval to demolish the existing detached garage and construct an <br /> approximately 288-square-foot, 12-foot-tall, detached carport; and (2) Variances from the <br /> Municipal Code (PMC) to reduce the required minimum lot depths from 100 feet to <br /> approximately 75 and 83.3 feet and to reduce the required minimum lot width from 80 feet to <br /> 75 feet as part of a proposed Minor Subdivision application to subdivide the property into two <br /> lots. <br /> Approved. Appeal period expires November 5, 2019. (Eric Luchini, 931-5612) <br /> P18-0286, David Morris/Valley Brokers on Main <br /> Application for Minor Subdivision approval to subdivide the existing approximately <br /> 13,039-square-foot parcel into two new parcels measuring approximately 6,529 square feet <br /> and 6,510 square feet located at 308 Adams Way. <br /> Approved. Appeal period expires November 5, 2019. (Eric Luchini, 931-5612) <br /> P19-0339, Victor Rueqa <br /> Application for Administrative Design Review approval to construct an approximately <br /> 360-square-foot covered patio addition to the rear of the existing single-family residence <br /> located at 4475 Entrada Drive. <br /> Approved. Appeal period expires November 5, 2019. (Fahteen Khan, 931-5616) <br /> Actions of the Zoning Administrator Page 1 of 1 October 23, 2019 <br />uncil approved the consent calendar as submitted <br /> Actions of the City Council Page 1 of 2 October 23, 2019 <br />endment to change the land use <br /> designation of the project site from Business Park (Industrial/Commercial and Office) and <br /> General and Limited Industrial to Retail/Highway/Service Commercial; Business and <br /> Professional Offices; and (2) approval of a Planned Unit Development (PUD) rezoning to rezone <br /> the project site from Planned Unit Development-General and Light Industrial (PUD-G&LI) <br /> District, Planned Unit Development-Industrial/Commercial-Office (PUD-I/C-O) District, and <br /> General Industrial (I-G-40,000) District to PUD-C District. <br /> Penalties for Illegal Demolition of Historic Buildings <br /> Consider adding a new section 18.140.030 — fines and restrictions on future development for <br /> illegal historic building demolition to the Municipal Code to strengthen preservation of historic <br /> buildings and penalize unpermitted alterations and demolitions. <br /> Future Planning Calendar Page 1 of 1 October 23, 2019 <br />single-story residence with an approximately <br /> 1,137-square-foot attached garage located at 5 Winding Oaks Drive. Zoning for the property is <br /> Planned Unit Development — Hillside Residential/Open Space (PUD-HR/OS) District. <br /> MEETING OPEN TO THE PUBLIC <br /> 3. Public Comment from the audience regarding items not listed on the agenda — Speakers are <br /> encouraged to limit comments to 3 minutes. <br /> Planning Commission <br /> Page 12 of 12 <br /> up to 6-inches in diameter and farther than 8-feet from the tree trunk may be <br /> removed if they are in conflict with the proposed work. Roots that are removed shall <br /> be cleanly cut using a hand saw. <br /> P19-0151 Planning Commission <br /> Page 11 of 12 <br /> for the Project <br /> Arborist to conduct a field inspection prior to building permit issuance to ensure all <br /> recommendations have been properly implemented. The Project Arborist shall certify in writing all <br /> P19-0151 Planning Commission <br /> Page 10 of 12 <br />rotection contractor shall be submitted to the Fire Prevention Bureau for approval; and 2.) Backflow <br /> prevention or connections to the public water mains. <br /> P19-0151 Planning Commission <br /> Page 8 of 12 <br />City will retain the cash <br /> deposit until all work is substantially complete, all areas are stabilized, and all hazards are <br /> mitigated to the satisfaction of the Director of Engineering/City Engineer. <br /> P19-0151 Planning Commission <br /> Page 7 of 12 <br />