My WebLink
|
Help
|
About
|
Sign Out
7
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2010-2019
>
2019
>
10-23
>
7
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2019 1:04:24 PM
Creation date
10/17/2019 1:04:23 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/23/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
THE CITY OF Planning Commission <br /> Agenda Report <br /> in <br /> LEASANTONU October 23, 2019 <br /> Item 7 <br /> SUBJECT: Actions of the City Council <br /> October 1, 2019 <br /> Consent Calendar: <br /> Actions of the Zoning Administrator and Planning Commission <br /> Council approved the consent calendar as submitted <br /> Public Hearing: <br /> Public Hearing: Consider introduction of an ordinance approving the application of Saravana <br /> Chilla for a Planned Unit Development (PUD) development plan to demolish an existing home <br /> and construct three detached single-family homes and related improvements located at <br /> 3987 Stanley Boulevard, and approval of a growth management agreement, as filed under <br /> Case PUD-133 <br /> Action recommended: Approve <br /> Action taken: Approved per staff recommendation with modifications to <br /> conditions to increase fence height along the east property line <br /> Vote: 5-0 <br /> October 15, 2019 <br /> Consent Calendar: <br /> Actions of the Zoning Administrator <br /> Second reading and adoption of Ordinance No. 2199 approving the application of Saravana <br /> Chilla for a Planned Unit Development (PUD) development plan to demolish an existing home <br /> and construct three detached single-family homes and related improvements located at <br /> 3987 Stanley Boulevard, and approval of a growth management agreement, as filed under Case <br /> PUD-133 <br /> Adopt a resolution determining the additional expenditure of $30,753 of Altamont Open Space <br /> funds for services related to strategic planning and conservation evaluation is consistent with <br /> the Altamont Landfill Settlement Agreement <br /> Council approved the consent calendar as submitted <br /> Actions of the City Council Page 1 of 2 October 23, 2019 <br />endment to change the land use <br /> designation of the project site from Business Park (Industrial/Commercial and Office) and <br /> General and Limited Industrial to Retail/Highway/Service Commercial; Business and <br /> Professional Offices; and (2) approval of a Planned Unit Development (PUD) rezoning to rezone <br /> the project site from Planned Unit Development-General and Light Industrial (PUD-G&LI) <br /> District, Planned Unit Development-Industrial/Commercial-Office (PUD-I/C-O) District, and <br /> General Industrial (I-G-40,000) District to PUD-C District. <br /> Penalties for Illegal Demolition of Historic Buildings <br /> Consider adding a new section 18.140.030 — fines and restrictions on future development for <br /> illegal historic building demolition to the Municipal Code to strengthen preservation of historic <br /> buildings and penalize unpermitted alterations and demolitions. <br /> Future Planning Calendar Page 1 of 1 October 23, 2019 <br />single-story residence with an approximately <br /> 1,137-square-foot attached garage located at 5 Winding Oaks Drive. Zoning for the property is <br /> Planned Unit Development — Hillside Residential/Open Space (PUD-HR/OS) District. <br /> MEETING OPEN TO THE PUBLIC <br /> 3. Public Comment from the audience regarding items not listed on the agenda — Speakers are <br /> encouraged to limit comments to 3 minutes. <br /> Planning Commission <br /> Page 12 of 12 <br /> up to 6-inches in diameter and farther than 8-feet from the tree trunk may be <br /> removed if they are in conflict with the proposed work. Roots that are removed shall <br /> be cleanly cut using a hand saw. <br /> P19-0151 Planning Commission <br /> Page 11 of 12 <br /> for the Project <br /> Arborist to conduct a field inspection prior to building permit issuance to ensure all <br /> recommendations have been properly implemented. The Project Arborist shall certify in writing all <br /> P19-0151 Planning Commission <br /> Page 10 of 12 <br />rotection contractor shall be submitted to the Fire Prevention Bureau for approval; and 2.) Backflow <br /> prevention or connections to the public water mains. <br /> P19-0151 Planning Commission <br /> Page 8 of 12 <br />City will retain the cash <br /> deposit until all work is substantially complete, all areas are stabilized, and all hazards are <br /> mitigated to the satisfaction of the Director of Engineering/City Engineer. <br /> P19-0151 Planning Commission <br /> Page 7 of 12 <br />