Laserfiche WebLink
Wording for these covenants and/or disclosures shall be submitted to the City Attorney for review <br /> and approval before recordation of the final map. <br /> Green Building and Sustainability Measures <br /> 27. PHOTOVOLTAIC AND SOLAR WATER HEATING SYSTEMS: The new residences shall be <br /> constructed to allow for future installation of a photovoltaic (PV) system and a solar water heating <br /> system. The measures shall be shown on the building permit plans for review and approval by the <br /> Director of Community Development prior to building permit issuance. The applicant shall provide <br /> the future owners the necessary information delineating the means by which photovoltaic panels <br /> can be applied to the roof of the new structure covered by this approval. This information shall be <br /> reviewed and approved by the Director of Community Development prior to occupancy of the <br /> units. The applicant shall comply with the following requirements for making the new dwelling <br /> units on the subject site photovoltaic-ready and solar water heating-ready: <br /> a. Electrical conduit and cable pull strings shall be installed from the roof/attic area to the <br /> building's main electrical panels; <br /> b. An area shall be provided near the electrical panel for the installation of an "inverter" <br /> required to convert the direct current output from the photovoltaic panels to alternating <br /> current; <br /> c. Engineer the roof trusses to handle an additional load as determined by a structural <br /> engineer to accommodate the additional weight of a prototypical photovoltaic system <br /> beyond that anticipated for roofing, <br /> d. Plumbing shall be installed for solar-water heating; and <br /> e. Space shall be provided for solar-heating tank. <br /> Construction Practices and Noticing <br /> 28. WORK HOURS: All demolition and construction activities, inspections, plan checking, material <br /> delivery, staff assignment or coordination, etc., shall be limited to the hours of 8 a.m. to 5 p.m., <br /> Monday through Friday. No construction shall be allowed on State or Federal Holidays or <br /> Saturdays or Sundays. The Director of Community Development may allow earlier start times" or <br /> later "stop times" for specific construction activities, e.g., concrete pouring. All construction <br /> equipment shall meet Department of Motor Vehicles (DMV) noise standards and shall be <br /> equipped with muffling devices. Prior to construction, the hours of construction shall be posted on <br /> site. <br /> 29. CONSTRUCTION PARKING: Campers, trailers, motor homes, or any other similar vehicle are <br /> not allowed on the construction site except when needed as sleeping quarters for a security <br /> guard subject to receipt of a temporary conditional use permit (per PMC 18.116.010.E). <br /> 30. CONSTRUCTION TRAILERS: A construction trailer shall be allowed to be placed on the project <br /> site for daily administration/coordination purposes during the construction period. <br /> 31. CONSTRUCTION AND PARKING MANAGEMENT PLAN: The applicant shall prepare a <br /> construction and parking management plan to address impacts and parking demands during the <br /> construction phase of the project. The construction and parking management plan shall be <br /> subject to review and approval by the City Traffic Engineer and Director of Community <br /> Development prior to issuance of a demolition permit, or the first building permit. whichever <br /> PUD-133 City Council <br /> Page 6 of 18 <br />