Laserfiche WebLink
d. Landscape design plan; <br /> e. Irrigation design plan; and <br /> f. Grading design plan. <br /> 103. CERTIFICATE OF COMPLETION: Upon completion of construction and prior to final inspection <br /> by the Building and Safety Division, the applicant's landscape architect shall submit a Certificate <br /> of Completion Package in PDF format to the Landscape Architecture Division for review and <br /> approval. The Certificate of Completion Package shall include: <br /> a. Project information sheet; <br /> b. Certificate of installation according to the landscape documentation package; <br /> c. Irrigation scheduling; <br /> d. Schedule of irrigation, landscape and irrigation maintenance; <br /> e. Landscape irrigation audit report; and <br /> f. Soil management report (if not previously submitted). <br /> 104. LANDSCAPING INSTALLATION: Prior to building permit final all landscaping shall be installed as <br /> shown on the approved building permit set and shall be inspected and approved by the <br /> Landscape Architecture Division. <br /> 105. CONCRETE CURBS: 6-inch vertical concrete curbs, with curb cuts or flush curbs with wheel <br /> stops, if determined to be acceptable by the Director of Engineering/City Engineer and Director of <br /> Community Development, shall be installed between all paved and landscape areas, in <br /> conformance with the City's Standard Specifications and Details. <br /> 106. EROSION CONTROL: For purposes of erosion control, the applicant shall plant a hydro seed <br /> mixture designed by the applicant's landscape architect and approved by the Landscape <br /> Architecture Division prior to installation. The erosion control shall be maintained by the applicant <br /> until permanent landscaping is in place. <br /> 107. BACKFLOW AND IRRIGATION METER SCREENING: All backflow prevention devices, above <br /> ground irrigation controls, and above ground irrigation meters shall be located and screened to <br /> minimize their visual impacts. These devices with their proposed screening shall be shown on the <br /> landscaping and utility plans submitted with the building permit plans or improvement plans, <br /> clearly marked "above ground" or "below ground" on the plans, and shall be subject to the review <br /> and approval of the City Landscape Architect prior to their installation. If above-ground, they shall <br /> be painted forest green or an equivalent dark-green color. Screens shall consist of berms, walls, <br /> or landscaping satisfactorily integrated into the landscape plan. Landscape screens shall include <br /> shrubbery designed by species and planting density to establish a complete screen within 1 year <br /> from the date of planting. Weather protection devices, such as measures to protect pipes from <br /> freezing, shall require approval by the City Landscape Architect prior to use; at no time shall <br /> fabric or other material not designed and/or intended for this purpose be wrapped around or <br /> otherwise placed on these devices. <br /> 108. MAINTENANCE: The applicant and all future owners of the property shall, at no expense to the <br /> City, maintain all the landscaped areas related to the project in a healthful, attractive and <br /> reasonably weed-free manner consistent with the approved landscape plan, for the duration of <br /> the existence of the project. <br /> Trees <br /> 109. ARBORIST REPORT UPDATE: Prior to issuance of a building permit, the applicant shall provide <br /> an updated arborist report based on the latest plans. The arborist report shall include updated <br /> PUD-134/P18-0332/P18-0334 Planning Commission <br /> Page 15 of 18 <br />ccess road. Yard and parking area may be <br /> able to be located farther than 200 feet from access roads, depending on the specific use. <br /> PUD-134/P18-0332/P18-0334 Planning Commission <br /> Page 13 of 18 <br /> lumber construction until the final inspection. <br /> PUD-134/P18-0332/P18-0334 Planning Commission <br /> Page 12 of 18 <br />nts, issued by the San Francisco Bay Regional Water Quality Control Board. The trash <br /> enclosure shall be constructed to prevent stormwater run-on and runoff and to contain litter and <br /> PUD-134/P18-0332/P18-0334 Planning Commission <br /> Page 11 of 18 <br /> Planning Commission <br /> Page 9 of 18 <br />