My WebLink
|
Help
|
About
|
Sign Out
PC-2019-21
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2010-2019
>
2019
>
PC-2019-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 1:04:28 PM
Creation date
9/26/2019 1:04:17 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
8/28/2019
DESTRUCT DATE
PERMANENT
DOCUMENT NO
PC-2019-21
NOTES
PUD-134_P18-0332_P18-0334, SHELL_7-ELEVEN, BRAD HIRST, 3760 AND 3790 HOPYARD RD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
trash, so that it is not dispersed by the wind or runoff during waste removal. The area enclosed <br /> shall drain to the sanitary sewer system and an area drain shall be installed in the enclosure area, <br /> providing a structural control such as an oil/water separator or sand filter. No other area shall <br /> drain into the trash enclosure. A sign shall be posted prohibiting the dumping of hazardous <br /> materials into the sanitary sewer. <br /> 83. FULL TRASH CAPTURE DEVICES: The applicant shall install trash capture devices at each <br /> upstream connection point to the public storm drain system subject to the review and approval of <br /> the Director of Engineering/City Engineer. Stormwater treatment controls, proposed in <br /> compliance with Provision C.3 of NPDES Permit No. CAS612008, shall also prevent the <br /> discharge of trash to the downstream municipal separate storm sewer systems and receiving <br /> waters. Discharge points from these treatment control facilities, including overflows, shall be <br /> appropriately screened (5 mm mesh screen) or otherwise configured to meet the full trash <br /> capture screening specification for storm flows up to the full trash capture 1-year, 1-hour storm <br /> hydraulic specification, in compliance with the NPDES Permit No. CAS612008. The applicant <br /> shall submit a Stormwater Management Plan as part of the improvement plans prepared by a <br /> California licensed civil engineer, which include but is not limited to the type, location, and sizing <br /> calculations of the treatment controls that will be installed. Full trash capture devices shall be a <br /> part of the "Stormwater Treatment Measures and Maintenance Agreement." <br /> 84. RESTAURANTS AND FOOD ESTABLISHMENTS: The applicant shall provide a contained area <br /> for cleaning mats, containers and equipment. The wash area shall be covered or designed to <br /> prevent runoff onto or from the area. The area shall be connected to the sanitary sewer system, <br /> subject to approval by the Dublin San Ramon Services District, or the cleaning mats, containers <br /> and equipment shall be collected in a containment area and removed regularly by a disposal and <br /> recycling service. If connected to the sanitary sewer, a grease abatement device (grease trap or <br /> interceptor) shall be installed, and a sign shall be posted prohibiting the dumping of hazardous <br /> materials. <br /> 85. CONSTRUCTION COMPLETION: Prior to occupancy, the applicant shall provide the following <br /> documents to the City Inspector: <br /> a. A letter prepared and signed by the applicant's engineer of record certifying the project <br /> permanent stormwater treatment measures and Hydromodification Management (HM) <br /> measures, if applicable, have been installed in accordance with the City approved <br /> improvement plans. Photographs shall be taken of all the stormwater treatment measures <br /> and HM measures, if applicable, and identified by matching the identification number stated <br /> in the city accepted improvement plans. <br /> b. Signed and completed construction Project Completion Inspection Checklist <br /> c. Bio retention soil certification form completed and certified by the applicant's soil supplier. <br /> FIRE DEPARTMENT — 925-454-2361 <br /> The Fire Prevention Bureau reviews building/civil drawings for conceptual on-site fire mains and fire <br /> hydrant locations only. Plan check comments and approval DO NOT include: 1.) Installation of the on- <br /> site fire mains and fire hydrants. Specific installation drawings submitted by the licensed underground fire <br /> protection contractor shall be submitted to the Fire Prevention Bureau for approval; and 2.) Backflow <br /> prevention or connections to the public water mains. <br /> 86. FIRE HAZARDS: The project developer shall keep the site free of fire hazards from the start of <br /> lumber construction until the final inspection. <br /> PUD-134/P18-0332/P18-0334 Planning Commission <br /> Page 12 of 18 <br />nts, issued by the San Francisco Bay Regional Water Quality Control Board. The trash <br /> enclosure shall be constructed to prevent stormwater run-on and runoff and to contain litter and <br /> PUD-134/P18-0332/P18-0334 Planning Commission <br /> Page 11 of 18 <br /> Planning Commission <br /> Page 9 of 18 <br />