Laserfiche WebLink
Green Building and Sustainability Measures <br />27. PHOTOVOLTAIC AND SOLAR WATER HEATING SYSTEMS: The new residences shall be <br />constructed to allow for future installation of a photovoltaic (PV) system and a solar water heating <br />system. The measures shall be shown on the building permit plans for review and approval by the <br />Director of Community Development prior to building permit issuance. The applicant shall provide <br />the future owners the necessary information delineating the means by which photovoltaic panels <br />can be applied to the roof of the new structure covered by this approval. This information shall be <br />reviewed and approved by the Director of Community Development prior to occupancy of the <br />units. The applicant shall comply with the following requirements for making the new dwelling <br />units on the subject site photovoltaic -ready and solar water heating -ready: <br />a. Electrical conduit and cable pull strings shall be installed from the roof/attic area to the <br />building's main electrical panels; <br />b. An area shall be provided near the electrical panel for the installation of an "inverter" <br />required to convert the direct current output from the photovoltaic panels to alternating <br />current; <br />c. Engineer the roof trusses to handle an additional load as determined by a structural <br />engineer to accommodate the additional weight of a prototypical photovoltaic system <br />beyond that anticipated for roofing; <br />d. Plumbing shall be installed for solar -water heating; and <br />e. Space shall be provided for solar -heating tank. <br />Construction Practices and Notici <br />28. WORK HOURS: All demolition and construction activities, inspections, plan checking, material <br />delivery, staff assignment or coordination, etc., shall be limited to the hours of 8 a.m. to 5 p.m., <br />Monday through Friday. No construction shall be allowed on State or Federal Holidays or <br />Saturdays or Sundays. The Director of Community Development may allow earlier "start times" or <br />later "stop times" for specific construction activities, e.g., concrete pouring. All construction <br />equipment shall meet Department of Motor Vehicles (DMV) noise standards and shall be <br />equipped with muffling devices. Prior to construction, the hours of construction shall be posted on <br />site. <br />29. CONSTRUCTION PARKING: Campers, trailers, motor homes, or any other similar vehicle are <br />not allowed on the construction site except when needed as sleeping quarters for a security <br />guard subject to receipt of a temporary conditional use permit (per PMC 18.116.010. E). <br />30. CONSTRUCTION TRAILERS: A construction trailer shall be allowed to be placed on the project <br />site for daily administration/coordination purposes during the construction period. <br />31. CONSTRUCTION AND PARKING MANAGEMENT PLAN: The applicant shall prepare a <br />construction and parking management plan to address impacts and parking demands during the <br />construction phase of the project. The construction and parking management plan shall be <br />subject to review and approval by the City Traffic Engineer and Director of Community <br />Development prior to issuance of a demolition permit, or the first building permit, whichever <br />comes first. The following items shall be incorporated into the construction and parking <br />management plan: <br />PUD -133 City Council <br />Page 6 of 18 <br />