My WebLink
|
Help
|
About
|
Sign Out
10
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2019
>
091719
>
10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2019 9:18:24 AM
Creation date
9/10/2019 4:24:40 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/17/2019
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 6 summarizes EBCE's 2018 launch power mix alongside PG&E's 2018 power <br />mix. <br />Electric <br />EBCE <br />EBCE <br />EBCE <br />PG&E <br />PG&E <br />Power <br />Bright <br />Brilliant <br />Renewable <br />(Standard <br />Solar <br />Generation <br />Choice <br />100 <br />100 <br />Rate) <br />Choice <br />Mix <br />Renewables: <br />38% <br />40% <br />100% <br />39% <br />100% <br />Biomass & <br />0% <br />0% <br />0% <br />4% <br />0% <br />Biowaste <br />Geothermal <br />0% <br />0% <br />0% <br />4% <br />0% <br />Eligible <br />0% <br />0% <br />0% <br />3% <br />0% <br />Hydroelectric <br />Solar Electric <br />19% <br />20% <br />50% <br />18% <br />100% <br />Wind <br />19% <br />20% <br />50% <br />10% <br />0% <br />Non - <br />Renewable <br />Coal <br />0% <br />0% <br />0% <br />0% <br />0% <br />Large <br />24% <br />60% <br />0% <br />13% <br />0% <br />Hydroelectric <br />Natural Gas <br />0% <br />0% <br />0% <br />15% <br />0% <br />Nuclear <br />0% <br />0% <br />0% <br />34% <br />0% <br />Unspecified <br />38% <br />0% <br />0% <br />0% <br />0% <br />Sources of <br />Power <br />Carbon -free <br />85% <br />100% <br />100% <br />86% <br />100% <br />Total <br />(includes <br />renewable <br />energy <br />percentages) <br />TOTAL <br />100% <br />100% <br />100% <br />100% <br />100% <br />Table 6 — 2018 EBCE and PG&E Power Mixes <br />Page 9 of 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.