My WebLink
|
Help
|
About
|
Sign Out
PC-2019-19
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2010-2019
>
2019
>
PC-2019-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 1:00:30 PM
Creation date
8/29/2019 5:17:57 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
8/14/2019
DESTRUCT DATE
PERMANENT
DOCUMENT NO
PC-2019-19
NOTES
P19-0059, CHASHMAWALA, DESIGN REVIEW, 4108 FOOTHILL ROAD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
d. Plumbing shall be installed for solar-water heating; and <br /> e. Space shall be provided for solar-heating tank. <br /> 25. GREEN BUILDING — RESIDENTIAL NEW CONSTRUCTION: Prior to building permit issuance, a <br /> list of the green building measures used in the design, covered by this approval, shall be provided <br /> to the Planning Division for review and approval by the Director of Community Development. The <br /> home covered by this approval shall be designed to achieve a "certified rating" of a minimum of <br /> 100 total points, achieving at least the minimum points in each category, using BuildltGreen's <br /> current Green Points rating system. The green building measures shall be shown on the building <br /> permit plans submitted to the Building and Safety Division. Each proposed point identified shall <br /> have a notation indicating the sheet(s) the point can be found. A special inspection by the <br /> Planning Division shall be coordinated with regards to exterior materials. Prior to building permit <br /> final, all of the green building measures indicated on the approved checklist shall be inspected <br /> and approved by either the City of Pleasanton, a third party rater, or the applicant shall provide <br /> written verification by the project engineer, architect, landscape architect, or designer. (Per PMC <br /> 17.50) (PROJECT SPECIFIC CONDITION) <br /> Construction Practices and Noticing <br /> 26. WORK HOURS: All demolition and construction activities, inspections, plan checking, material <br /> delivery, staff assignment or coordination, etc., shall be limited to the hours of 8 a.m. to 5 p.m., <br /> Monday through Saturday. No construction shall be allowed on State or Federal Holidays or <br /> Sundays. The Director of Community Development may allow earlier "start times" or later"stop <br /> times"for specific construction activities, e.g., concrete pouring. All construction equipment shall <br /> meet Department of Motor Vehicles (DMV) noise standards and shall be equipped with muffling <br /> devices. Prior to construction, the hours of construction shall be posted on site. <br /> 27. CONSTRUCTION PARKING: Campers, trailers, motor homes, or any other similar vehicle are <br /> not allowed on the construction site except when needed as sleeping quarters for a security <br /> guard subject to receipt of a temporary conditional use permit (per PMC 18.116.010.E). <br /> 28. CONSTRUCTION TRAILERS: A construction trailer shall be allowed to be placed on the project <br /> site for daily administration/coordination purposes during the construction period. <br /> 29. TRAFFIC MANAGEMENT PLAN: The applicant shall prepare a Traffic Management Plan (TMP) <br /> to ensure that the construction traffic will not conflict with the Foothill High School a.m. or p.m. <br /> school traffic hours, Monday through Friday during the regular school year. The TMP shall be <br /> submitted prior to the start of the first construction phase to the satisfaction of the Planning <br /> Division. (PROJECT SPECIFIC CONDITION) <br /> 30. CONSTRUCTION AND PARKING MANAGEMENT PLAN: The applicant shall prepare a <br /> construction and parking management plan to address impacts and parking demands during the <br /> construction phase of the project. The construction and parking management plan shall be <br /> subject to review and approval by the City Traffic Engineer and Director of Community <br /> Development prior to issuance of a demolition permit, or the first building permit, whichever <br /> comes first. The following items shall be incorporated into the construction and parking <br /> management plan: <br /> a. Show truck route for construction and delivery trucks that does not include <br /> neighborhood residential streets, unless approved by the City Traffic Engineer; <br /> b. Show construction vehicles and equipment parking area, materials storage, temporary <br /> fencing, construction trailer location, and construction contractors/workers parking <br /> area. <br /> P19-0059 Planning Commission <br /> Page 5of12 <br />P19-0059 Planning Commission <br /> Page 4 of 12 <br />