Laserfiche WebLink
39. SCHOOL IMPACT FEES — RESIDENTIAL NEW CONSTRUCTION: Applicant shall work with the <br /> Pleasanton Unified School District (PUSD) to develop a program to offset this project's long term <br /> effect on school facility needs in Pleasanton. This program shall be designed to fund school <br /> facilities necessary to offset this project's reasonably related effect on the long-term need for <br /> expanded school facilities. The method and manner for the provision of these funds and/or <br /> facilities shall be approved by the PUSD and in place prior to building permit issuance. Written <br /> proof of compliance with this condition shall be provided by applicant to the City, on a form <br /> generated by the PUSD, prior to building permit issuance. <br /> ENGINEERING DEPARTMENT— LAND DEVELOPMENT— 925-931-5650 <br /> General <br /> 40. COMMON AREAS: The property owner will be responsible for the maintenance of the common <br /> areas as per the maintenance agreements recorded with PM 10010 in Alameda County <br /> Recorder's office. The copies of the recorded documents are available in the City Engineering <br /> Department. (PROJECT SPECIFIC CONDITION) <br /> Design <br /> 41. DESIGN PER CITY STANDARDS: All public improvements shall be designed in compliance with <br /> the City Standard Specifications and Details in effect at the time of the issuance of the <br /> encroachment, grading, or subdivision permit, whichever occurs first. <br /> 42. DUST CONTROL PLAN: The applicant shall submit a written dust control plan or procedure with <br /> the first submittal of the grading and improvement plans to the Engineering Department subject to <br /> the review and approval of the Director of Engineering/City Engineer. <br /> 43. RETAINING WALLS: All retaining walls along the street shall be located behind the public service <br /> easement (PSE), unless otherwise approved by the Director of Engineering/City Engineer. All <br /> retaining walls with a minimum height of 4 feet, measured from the bottom of the footing to the <br /> finished grade at the top of the wall, and all retaining walls with a surcharge shall be designed by <br /> a California licensed civil or structural engineer. <br /> Construction <br /> 44. CONSTRUCTION PER CITY STANDARDS: All public improvements shall be constructed in <br /> compliance with the City Standard Specifications and Details in effect at the time of the issuance <br /> of the encroachment, grading, or subdivision permit, whichever occurs first. <br /> 45. ENCROACHMENT AND HAUL ROUTE PERMITS: The applicant's contractor shall obtain an <br /> encroachment and haul route permit from the Engineering Department prior to moving equipment <br /> to the project site or performing work in the public right of way or within public easements. The <br /> applicant's contractor shall submit a completed and signed encroachment permit application <br /> accompanied with six copies of City-approved improvement plans, proof of insurance with <br /> endorsement adding the City as an additional insured, a copy of a valid City of Pleasanton <br /> business license, applicable fees, and other requirements determined by the Director of <br /> Engineering/City Engineer. <br /> P19-0059 Planning Commission <br /> Page 7 of 12 <br /> WATER FEES AND WATER METER CONNECTION FEES: The applicant shall pay the <br /> applicable Zone 7 and City connection fees and water meter cost for any water meters and <br /> irrigation meters, if applicable, prior to building permit issuance. <br /> 38. SEWER FEES: The applicant shall pay the applicable Dublin-San Ramon Services District <br /> (DSRSD) and City sewer permit fees prior to building permit issuance. <br /> P19-0059 Planning Commission <br /> Page 6 of 12 <br />r; <br /> b. Show construction vehicles and equipment parking area, materials storage, temporary <br /> fencing, construction trailer location, and construction contractors/workers parking <br /> area. <br /> P19-0059 Planning Commission <br /> Page 5of12 <br />P19-0059 Planning Commission <br /> Page 4 of 12 <br />