My WebLink
|
Help
|
About
|
Sign Out
05
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2019
>
090319
>
05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2019 2:25:03 PM
Creation date
8/28/2019 2:25:01 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/3/2019
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIRSTCARBON Proposal <br /> Deliverables <br /> • One electronic copy of the Administrative Draft Addendum (in Microsoft Word and PDF format)to <br /> the City of Pleasanton for review and comment. <br /> • One electronic copy of the draft Traffic study(in Microsoft Word and PDF format)to the City of <br /> Pleasanton for review and comment. <br /> • 23 hard copies and one electronic copy(PDF)of the final Traffic Study to the City of Pleasanton for <br /> distribution. <br /> • 23 hard copies and one electronic copy(PDF)of the final Addendum to the City of Pleasanton for <br /> distribution. (Appendices will be placed on a CD affixed to each document copy.) <br /> Assumptions <br /> • FCS will be provided the following technical reports for use in the Addendum: <br /> - Health Risk Assessment(assumed to use accepted Bay Area Air Quality Management District <br /> (BAAQMD) methodology) <br /> - Arborist Report <br /> - Noise Assessment <br /> - Phase I Environmental Site Assessment(Phase I ESA) <br /> • FCS is not expected to prepare any technical analyses with the exception of general air quality <br /> modeling using CalEEMod and traffic analysis(as provided by Hexagon Transportation Consultants, <br /> Inc.). FCS will summarize and incorporate by reference the technical reports provided by the City and <br /> Hexagon. <br /> • FCS will provide up to 23 hard copies of the Addendum and Traffic Study, as needed,for the <br /> Planning Commission and City Council. <br /> • Cost will be billed on a percentage basis. <br /> Cost <br /> The total cost to perform the tasks and deliverables listed above is estimated to be$79,995.An <br /> approximately 10 percent contingency of$8,000 is included to be used for direct costs (printing) or <br /> additional tasks, as assigned by the City and at the discretion if FCS. In addition, an approximately 10 <br /> percent contingency of$5,280 is included to be used for any unforeseen, additional traffic analysis. The <br /> total charges shall not exceed $93,275. <br /> North America I Europe I Africa I Australia I Asia www.firstcarbonsolutions.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.