My WebLink
|
Help
|
About
|
Sign Out
3_Exhibits A & C-F
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2010-2019
>
2019
>
08-28
>
3_Exhibits A & C-F
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2019 4:43:48 PM
Creation date
8/20/2019 4:43:17 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/28/2019
Document Relationships
3
(Message)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2010-2019\2019\08-28
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
construction of all foundations, retaining walls, drainage and geotechnical aspects of the <br /> development to ensure compliance with the approved grading and improvement plans. The <br /> geotechnical engineer shall be present on site during grading and excavation operations and <br /> certify on the as-built plans that the inspection results and the as-built conditions of the <br /> development were constructed in general compliance with the project geotechnical report and <br /> improvement plans. The results of the inspections shall be submitted to the Director of <br /> Engineering/City Engineer prior to the issuance of the certificate of occupancy. The applicant <br /> shall bear all costs for work related to this condition by their geotechnical engineer. <br /> 55. ENCROACHMENT AND HAUL ROUTE PERMITS: The applicant's contractor shall obtain an <br /> encroachment and haul route permit from the Engineering Department prior to moving equipment <br /> to the project site or performing work in the public right of way or within public easements. The <br /> applicant's contractor shall submit a completed and signed encroachment permit application <br /> accompanied with six copies of City-approved improvement plans, proof of insurance with <br /> endorsement adding the City as an additional insured, a copy of a valid City of Pleasanton <br /> business license, applicable fees, and other requirements determined by the Director of <br /> Engineering/City Engineer. <br /> 56. RIGHT OF ENTRY: The applicant shall furnish written proof of all necessary rights-of-entry, <br /> permits and/or easements for the construction of off-site temporary or permanent improvements <br /> to the Director of Engineering/City Engineer prior to the issuance of the encroachment, grading, <br /> or subdivision permit, whichever occurs first. <br /> 57. DAMAGE TO EXISTING PUBLIC AND PRIVATE IMPROVEMENTS: The applicant shall repair <br /> damage to existing public and private improvements on and near the project site and along the <br /> haul route at their full expense caused by construction activities as determined and to the <br /> satisfaction of the Director of Engineering/City Engineer and prior to the City Council acceptance <br /> of public improvements. <br /> 58. AS-BUILT DRAWINGS: The applicant's California licensed civil engineer shall submit signed and <br /> stamped as-built drawings and AutoCAD files for the construction of the public improvements and <br /> stormwater treatment system subject to the review and approval of the Director of <br /> Engineering/City Engineer and prior to the release of the performance and labor and materials <br /> bond. <br /> Utilities <br /> 59. SEPTIC TANKS: The applicant shall abandon all existing on-site septic tanks or holding tanks in <br /> compliance with the Alameda County Department of Health Services requirements prior to <br /> issuance of the encroachment, grading, or subdivision permit, whichever occurs first, unless <br /> otherwise approved by the Director of Engineering/City Engineer. <br /> 60. DESTRUCTION AND ABANDONMENT OF WATER WELLS: The applicant shall destroy or <br /> abandon all existing on-site water wells in compliance with Alameda County Ordinance 73-68 and <br /> submit a copy of the Alameda County permit prior to issuance of the encroachment, grading, or <br /> subdivision permit, whichever occurs first, to the Engineering Department unless otherwise <br /> approved by the Director of Engineering/City Engineer. <br /> 61. CONTINUED USE OF EXISTING WATER WELLS: The applicant shall notify the Engineering <br /> Department in writing of Zone 7's desire to retain any water well concurrently with the first plan <br /> check of the improvement plans. The applicant shall submit a written request to the Director of <br /> Engineering/City Engineer for approval for the temporary use of an existing water well(s) for <br /> construction water or for permanent use such as non-potable outdoor landscaping irrigation. The <br /> PUD-133 Planning Commission <br /> Page 10 of 18 <br />achment, grading, or subdivision permit, whichever occurs first. <br /> 54. GEOTECHNICAL CONSULTANT— CERTIFICATION OF CONSTRUCTION OF SUBDIVISIONS: <br /> The applicant's California licensed geotechnical engineer shall inspect and approve the <br /> PUD-133 Planning Commission <br /> Page 9 of 18 <br />