Laserfiche WebLink
In early 2019 residents of Touriga Drive expressed continued concerns of speeding on <br />between Chablis Court and Palomino Drive. The residents believed that enough <br />neighborhood support for speed lumps was in place to allow for the expedited speed lump <br />program to be implemented. Speeds were measured and found to be higher than the <br />average residential streets and an Expedited Speed Lump petition was created for Touriga <br />Drive. The petition included three speed lumps between Chablis Court and Palomino <br />Drive. <br />The Expedited Speed Lump Program requires at least 67% of the residences within 500 <br />feet of the proposed speed lumps are supportive of the installation. Additionally, ALL of <br />the property owners directly fronting the speed lumps must approve the installation. <br />Signatures were collected and show a strong majority (72%) of the residents support the <br />speed lump installation. Additionally, all of the property owners adjacent to the speed <br />lump locations support the installation. <br />• Status Under Review <br />• Next Steps/Details: The project is going to City Council on September 17, <br />2019. <br />• Applicant: Resident Group <br />• Staff Contact(s): Mike Tassano <br />Regional Proiects <br />54. State Route 84 Transportation/Traffe Project <br />SR 84 <br />There are two separate projects underway on State Route (SR) 84. The segment of SR 84 <br />from Concannon Boulevard to Ruby Hill Drive is under construction and will widen the <br />roadway from one lane in each direction to two lanes in each direction. This project is <br />managed by Alameda County Transportation Commission and has an estimated project <br />completion date of fall 2019. <br />The segment of SR 84 from Pigeon Pass to I-680 has completed environmental review <br />and Caltrans adopted the environmental document in the summer of 2018. Preliminary <br />engineering and design has started . The design process and right of way acquisition will <br />take approximately two years with construction to follow in 2021. <br />Construction of the segment of SR 84 from Pigeon Pass to 1-680 will be the final segment <br />in a series of improvements to widen SR 84 to expressway standards from I-580 in <br />Livermore to 1-680 in Sunol. Environmental review of the SR 84 project began in 2002, <br />and completion of this final segment will conclude this nearly 20 -year project. <br />• Status Under Review <br />• Next Steps/Details: Alameda CTC to awarded design contract in spring 2018 <br />and began ROW acquisition. Caltrans approved the <br />Environmental Document (Spring 2018). Complete ROW <br />and Design (2020) begin construction (2021). Alameda <br />County Transportation Commission projects targe <br />• Staff Contact(s): Mike Tassano <br />Page 19 of 20 <br />