My WebLink
|
Help
|
About
|
Sign Out
02
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
ECONOMIC VITALITY
>
AGENDA PACKETS
>
2019
>
071819
>
02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2019 12:06:46 PM
Creation date
7/15/2019 3:03:42 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
7/18/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• Applicant: Anabi Oil Real Estate <br />• Staff Contact(s): Jenny Soo <br />31. 3598 Stanley Blvd. I Commercial <br />P17-0278 and P17 0280 Surf-Thru Car Wash <br />Applications for Design Review approval and a Conditional Use Permit to construct and <br />operate a car wash and related improvements at 3598 Stanley Blvd. <br />• Status Approved <br />• Next Steps/Details: Approved by Planning Commission on February 14, <br />2018. Submitted for building permit plan check in June <br />2018. <br />• Applicant: Scott Howry <br />• Staff Contact(s): Natalie Amos <br />32. 6900 Valley Trails Dr. Residential- Single -Family <br />PUD -113, P16-1386, and Ponderosa Homes <br />Tract Map 8259 <br />Applications to subdivide an approximately 9 -acre site at 6900 Valley Trails Dr. and <br />construct 36 detached single-family homes and a private clubhouse with related site <br />improvements. The existing church and other improvements would be demolished. <br />• Status Under Construction <br />• Next Steps/Details: Construction started May 2018. <br />• Applicant: Rick Rosenbaum, Ponderosa Homes <br />• Staff Contact(s): Natalie Amos <br />33. 445 Boulder Ct.I Commercial <br />P17-0799 Blocka Construction <br />Application for Design Review for construction of an approximately 22,370 -square -foot, <br />two-story industrial building with outdoor equipment storage and related site <br />improvements on a vacant lot. <br />• Status Under Construction <br />• Next Steps/Details: Approved; Construction started in March 2019. <br />• Applicant: Blocka Construction <br />• Staff Contact(s): Natalie Amos <br />34. 3 Wyoming St.I Commercial <br />P16-1827, P16-1895 <br />Applications for Lot Line Adjustment to combine two lots (3 and 19 Wyoming St.) into a <br />single parcel and Design Review approval to construct an approximately 21,060 -square - <br />foot commercial building and related site improvements. <br />• Status Under Construction <br />• Next Steps/Details: Approved and under construction. Tenanting underway; <br />occupancy expected in June 2019. <br />• Applicant: Tim Cotton, TK Builders <br />Page 10 of 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.