My WebLink
|
Help
|
About
|
Sign Out
02
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
ECONOMIC VITALITY
>
AGENDA PACKETS
>
2019
>
071819
>
02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2019 12:06:46 PM
Creation date
7/15/2019 3:03:42 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
7/18/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• Next Steps/Details: Approved by Planning Commission on April 24, 2019. <br />Awaiting submittal of building permit. <br />• Applicant: Simon Properties <br />• Staff Contact(s): Jennifer Hagen <br />24. 1851 Rose Ave. Residential- Single -Family <br />PUD -99 I Rose Avenue Estates <br />Application to construct 19 single-family homes and related site improvements on an <br />approximately 9.02 -acre property. <br />• Status Under Construction <br />• Next Steps/Details: Approved by City Council on April 19, 2016. Two model <br />homes completed; four single-family homes under <br />construction, occupancy started in April 2019 and <br />completion of the project is expected for April 2020. <br />• Applicant: Ponderosa Homes II, Inc. <br />• Staff Contact(s): Jenny Soo <br />25. 11249 Dublin Canyon Rd. Residential- Single -Family <br />PUD -115, P15-0595, P15- <br />0596 <br />Applications for: (1) PUD development plan for three single-family residential lots (one <br />existing single-family residence and two new single-family residences); (2) Minor <br />Subdivision approval to subdivide the existing 2.91 -acre parcel into three parcels; and (3) <br />Growth Management allocation. <br />• Status Under Construction <br />• Next Steps/Details: Approved by City Council on April 19, 2016 and under <br />construction. The house on Lot 1 is expected to be <br />complete in summer of 2019. Construction of the home on <br />Lot 3 is subsequently expected. <br />• Applicant: Guy HoustonNalley Capital Realty <br />• Staff Contact(s): Jenny Soo <br />26. 88 Silver Oaks Ct. I Residential- Single -Family <br />PUD -116 <br />Application for Planned Unit Development Plan to subdivide a 34.3 -acre parcel located <br />at 88 Silver Oaks Court into two new single-family home lots (3.97 -acres and 15.1 - <br />acres), and a 15.23 -acre remainder lot containing the existing residence. <br />• Status Under Construction <br />• Next Steps/Details: Building permit plans have been issued and the project is <br />expected to be completed in 2019. <br />• Applicant: Frank Berlogar <br />• Staff Contact(s): Jenny Soo <br />27. 2188 Foothill Rd. <br />PUD -117 <br />Residential- Single -Family <br />Golden Oak Project <br />Page 8 of 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.