Laserfiche WebLink
SECTION 1: GENERAL CONDITIONS, WATER SUPPLY TURNOUT <br /> 1.1 The potable water point of delivery to the recycled water system will be located at the <br /> existing tee connection on the Pleasanton 16-inch water line located on the north boundary of the <br /> Dublin San Ramon Services District("DSRSD") Regional Wastewater Treatment Plant. <br /> 1.2 A water supply turnout was established in accordance with the Temporary Agreement, <br /> including a billing meter, flow control valve, and backflow prevention device. DERWA is <br /> responsible for operation and maintenance of all facilities downstream of the point of delivery <br /> including the billing meter in accordance with Pleasanton metering requirements. Control of <br /> flow through the turnout shall be through the flow control valve. Real time water flow data shall <br /> be transmitted to the Pleasanton Supervisory Control And Data Acquisition("SCADA") <br /> monitoring system. Introduction of potable water to the recycled water system shall meet all <br /> applicable public health requirements for backflow prevention. Any future modification of the <br /> turnout, including but not limited to the billing meter, flow control valve, and backflow <br /> prevention device, shall be approved by Pleasanton before being put into service. <br /> 1.3 The billing meter shall be owned and regularly maintained by DERWA. Pleasanton shall <br /> bill DERWA for the quantities of potable water utilized when a supply request is initiated by <br /> DERWA. Pleasanton shall not bill DERWA for the quantities of potable water supplied when <br /> Pleasanton initiates use of the turnout to improve its potable water quality. DERWA shall be <br /> responsible for maintaining the billing meter, including all related costs, in a manner consistent <br /> with DSRSD standard practice <br /> SECTION 2: TURNOUT OPERATION REQUESTS AND NOTIFICATIONS <br /> 2.1 So long as potable water is available at the turnout, the flow control valve may be operated <br /> by DERWA or DSRSD as needed to ensure DERWA's ability to meet daily recycled water <br /> demands or to comply with any supply request from Pleasanton in order to improve water quality <br /> in Pleasanton's potable water distribution system. <br /> 2.2 If initiated by Pleasanton, the Pleasanton Operations Services Department shall, as soon as <br /> practicable, notify the DSRSD Operations Manager by phone of the request to operate the <br /> turnout for the benefit of Pleasanton. <br /> 2.3 The DSRSD Operations Manager, in coordination with DERWA, shall, as soon as <br /> practicable, notify the Pleasanton Operations Services Department by phone any time the turnout <br /> is opened and placed into operation for the benefit of DERWA. <br /> 2.4 The DSRSD Operations Manager, in coordination with DERWA, shall, as soon as <br /> practicable, notify the Pleasanton Operations Services Department of any significant changes to <br /> the estimated rate and duration of use when the turnout is open and will, as soon as practicable, <br /> provide notification when use of the turnout is terminated. <br /> 2 <br />