Laserfiche WebLink
EXHIBIT A <br /> cii <br /> ARCHITECTS <br /> ENGINEERS <br /> June 5, 2019 <br /> City of Pleasanton <br /> 200 Old Bernal Avenue <br /> Pleasanton, CA 94566 <br /> Elk Grove, CA 95624 <br /> Attention: Adam Nelkie <br /> Senior Civil Engineer, Engineering Department <br /> Subject: Softball Fieldhouse <br /> Fee Increase request for <br /> Design Revisions and Construction Administration Services <br /> ATI Project No. P2611-A02 <br /> Dear Adam, <br /> Per our meeting on May 15, 2019, the City of Pleasanton would like issue an Addendum to <br /> the May 29, 2019 Bid Set to include space planning for six office cubicles at the second floor, <br /> associated electrical work, and any revisions requested as part of the Public Work Inspector's <br /> review. The City has also requested a quote for Construction Administration services to be <br /> provided throughout the construction period from August 5, 2019 through February 28, 2020. <br /> `La <br /> 1. Scope of Work: <br /> 1.1 Design Revisions: <br /> Using the preferred layout provided by the City, ATI will provide space planning for <br /> work cubicles, provide dimensioned plans, verify code compliance including exiting <br /> and accessibility and assist in furniture selection. <br /> Updated CAD backgrounds will be provided to the Electrical and Mechanical <br /> Engineers for updates to power, data, lighting, HVAC and plumbing designs. <br /> Revisions requested by the City will also be incorporated. <br /> 1.2 Construction Administration Services: <br /> a. Attend a bid job walk and respond to bid requests for information. <br /> b. Attend a pre-construction kick-off meeting. <br /> c. Respond to Construction requests for information. <br /> d. Review Submittals and shop drawings. <br /> e. Perform periodic site visits to confirm work is being installed per design intent. <br /> f. Attend weekly construction meetings to provide architectural input. (Allow for 162 <br /> hours in addition to kick-off meetings and punch walks) <br /> g. Prepare punchlist to identify items that need to be addressed by contractor. <br /> 3009 DouglasBlvd./290 h. Perform final punch walk to verify completion of work <br /> NoseyNe,G 95661 <br /> T:916-772-1800 <br /> wwwatlae aarn <br />