Laserfiche WebLink
Exhibit A <br /> murraysmith)0 <br /> Date: June 28, 2019 <br /> Mr. Adam Nelkie <br /> City of Pleasanton <br /> Engineering Department <br /> 200 Old Bernal Ave <br /> Pleasanton, CA 94566 <br /> Re: Three Tank Rehab—Contract Amendment Request <br /> Dear Adam, <br /> As we are nearing the construction phase of the Three Tank Rehabilitation project, we would like <br /> to submit the following amendment request for design services. Below is a breakdown of the prior <br /> billings through Quincy Engineering, along with a summary of the billings through May 31. <br /> Total Billed as Total Billed as <br /> Budget of 1/31 of 5/31 Budget Remaining <br /> Quincy/Murraysmith $ 97,318.00 $ 47,812.69 $ 92,967.69 $ 4,350.31 <br /> CSI $ 1,925.00 $ - $ 1,925.00 $ - <br /> V&A $ 34,500.00 $ 4,173.75 $ 23,928.50 $ 10,571.50 <br /> Frisch $ 29,050.00 $ 2,219.00 $ 25,459.50 $ 3,590.50 <br /> Total $ 54,205.44 $ 144,280.69 $ 18,512.31 <br /> We have billed the remaining fees for design, and there remains a balance of$4,350 for bid <br /> phase services as shown above. Based on our discussions, the City is prepared to amend the <br /> contract in the amount of$10,000 for additional analysis in the pre-design phase. <br /> Thank you for considering this amendment request. <br /> Sincerely, <br /> (' — --- <br /> MU RRAYSM ITH <br /> Davina Carboni, PE <br /> Senior Engineer <br /> www.murraysmith.us <br />