My WebLink
|
Help
|
About
|
Sign Out
05
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2019
>
071619
>
05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2019 3:58:11 PM
Creation date
7/10/2019 3:53:49 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
7/16/2019
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FRISCH ENGINEERING, INC. dba Frisch Electric <br /> Consulting Electrical Engineers and Programmers Electrical Contractor <br /> 13405 Folsom Blvd.,Unit 600 C-10 Lic#1025671 <br /> 11. Folsom,CA 95630 Phone: (916)353-1025 <br /> PROFESSIONAL ENGINEERING SERVICES COST ESTIMATE <br /> JOB TITLE: Pleasanton Ruby Hill PS modifications and Tank Rehabilitation DATE: 6/23/2019 <br /> CLIENT: Murray Smith and Associates <br /> Description of Services:Construction Services <br /> We will perform the following services to the extent possible limited only by the budget of hours and costs. We have estimated the quantity of hours for each <br /> task based on experience with similar projects or as directed. Occasionally,project circumstances require more attention than anticipated. If the project <br /> requires more effort than allocated,additional budget may be required. <br /> Construction Services Electrical Engineering Discipline <br /> Task Description Principal Senior Senior Junior Associate Total hours cost per task <br /> Engineer Engineer Designer Designer Designer per task <br /> 1A Meetings and PM 2 each 0 3 12 0 0 15 $2,445.00 <br /> 1B Respond to RFIs 3 each 0 3 12 0 0 15 $2,445.00 <br /> 1C Change Order Documents 2 each 0 4 16 0 0 20 $3,260.00 <br /> 1D Submittal Reviews 5 each 0 7 25 0 0 32 $5,225.00 <br /> 1E Factory Testing 1 days 0 2 8 0 0 10 $1,630.00 <br /> 1F Site Visit 2 visits 0 5 18 0 0 23 $3,755.00 <br /> 1G Witness Testing 2 days 0 5 18 0 0 23 $3,755.00 <br /> 1H Inspection and Punchlist 1 revs 0 2 8 0 0 10 $1,630.00 <br /> 11 As Built Drawings lot 0 0 2 0 5 7 $959.00 <br /> Travel Expense and Per Diem $1,600 <br /> Subtotal Hours 0 31 119 0 5 155 <br /> Hourly rate per discipline $185 $175 $160 $140 $115 Subtotal Costs <br /> Total cost per discipline $0 $5,425 $19,104 $0 $575 $26,704.00 <br /> Total Costs $26,704.00 <br /> Assumptions: <br /> • Individual tasks cost are approximate and some cost shifting between tasks may be necessary <br /> • This quotation does not include Arc Flash Analysis(unless specifically stated)as required by the NFPA 70 Electrical Code.That analysis and <br /> associated equipment labelling can be provided for an additional fee. <br /> Deliverables <br /> • Submittal reviews,inspection reports,punchlists,as built drawings <br /> Terms: <br /> • This is a time and materials quotation with anticipated budget of hours and costs. We anticipate that we can perform the scope as described within <br /> our budget. If the Client's needs or project circumstances cause us to exceed our anticipated budget,we will make every effort to inform the Client in <br /> advance of work for authorization <br /> • Client will be invoiced monthly based on project progress. <br /> • Changes to project scope may result in increased or reduced costs <br /> Acceptance: <br /> • I agree to project scope,assumptions,deliverables and terms <br /> and authorize Frisch Engineering to proceed. <br /> X. <br /> Title Date <br /> 6/23/2019 <br /> Pleasanton Ruby Hill CM Frisch 1 cost.xlsx Quote <br />
The URL can be used to link to this page
Your browser does not support the video tag.