Laserfiche WebLink
EXHIBIT J: PUBLIC COMMENTS ,IPLEp,SAN _ON <br /> DOWNTOWN SPECIFIC PIAN UPDATE <br /> From: Mike Carey <br /> Sent: Friday,June 14, 2019 12:52 AM <br /> To: Megan Campbell; Stefanie Ananthan; Ellen Clark; Shweta Bonn <br /> Subject: Staff response-2017-2019 Total Pleasanton PUD projects list past 3 years <br /> Megan (city of Pleasanton) please provide the list below from Staff showing the total PUD applications <br /> in Pleasanton over the past 3 years and Add this to my next email attachment that describes the details <br /> of the below PUD'S. <br /> Please include ALL of this in the June-26th Planning Commission packet. <br /> Hi Mike, <br /> Sonal was able to put the list together of PUD applications from 2017 to now. See below: <br /> • 2017 <br /> o PUD-123-2694 Stoneridge Dr. <br /> o PUD-124-4682 Augustine St. <br /> o PUD-125-2350 Santa Rita Rd. <br /> o PUD-126- 1803 Santa Rita Rd. <br /> o PUD-127-3987 Stanley Blvd. <br /> o PUD-128-6300 Alisal St. <br /> o PUD-129-3780 Stanley Blvd. <br /> • 2018 <br /> o PUD-130- 10807 Dublin Canyon Rd. <br /> o PUD-131-481 Sycamore Rd. <br /> o PUD-133-3987 Stanley Blvd. <br /> o PUD-134-3760 Hopyard Rd. <br /> • 2019 <br /> o PUD-135-990 Sycamore Rd. <br /> o PUD-136- 1008 Stoneridge Mall Rd. <br /> Megan Campbell <br /> Associate Planner, Community Development Department <br /> City of Pleasanton I P.O. Box 520, Pleasanton, CA 94566 <br /> rellMen p <br /> Prepared for the June 26,2019, Planning Commission Meeting 23 <br />ees ,i GConditional($814) <br /> ❑F.IR($3,099.81) 00-20,000 sq ft($3,258) fiMinxu Conditional(5814) <br /> ❑Negative Declaration($2,216.25) C20,00t-60,000 sq ft($6.145) °Large Family Daycare($1,086) <br /> ❑County Clerk Processing Fee($50) 060.0(11-100.000 sq fl($16,291) DPiets(other than cat,it dogs.)($217) <br /> ❑General Plan Amendment($16,150) 0100.0tt)I+sq ft($21,721) °Temporary Conditional($132) <br /> ❑Growth Management($868) rUD Modifications ❑Administrative Temporary($27) <br /> Ha Q patirstWCatta giillg OMinorModification—existing Variance <br /> CNon-exempt—no hearing(S 108) residential development(5106) General(52,454) <br /> ❑Non-exempt with hearing(5271) °Minor Modification($543) Developed Residential Lot(5543) <br /> ❑Lot-Line Adjustment(5467) °Major Mudil`tcation($2,172) =°the <br /> 1 II. GENERAL DATA REQUIRED 1 <br /> A. Name of Applicant(glean Print): <br /> B. Address or Location of Property: , ,_.._ <br /> C. Assessor's Parcel Number:s): <br /> I). Site Area(acres/N.ft): <br /> F. Current Zoning: F. Proposed Zoning: <br /> G. Existing Use of Property: __, <br /> H. Description of Proposal- <br /> (continue on separate sheet if necessary) <br /> (Refer to the appropriate"Inforrnatioi !Handouts".for required submittal information that must accompany this application.) <br /> (continued on reverse) r 7/1110197 , <br /> Prepared for the June 26, 2019, Planning Commission Meeting 22 <br />he lands with< 10%, 10.254%and>25%slopes. A <br /> development profile may be required by the Director of Community Development, (Consult <br /> with Planning staff to determine if applicable for your project.) <br /> n. Conceptual Utility Plan: Show underground utilities (sewer,gas,electric, water); location of <br /> backflow preventers,aboveground electrical utilities, boxes,transformers, meter mains. fire <br /> standpipes, etc.; overhead utilities, location of existing joint poles. Plans should indicate any <br /> utilities to be remove°and/or se'vices placed underground <br /> o. Street Improvement Plan: Plans indicating the proposed street improvements. The plans <br /> need to contain dimensions and detail to show right-of-way and pavement widths, street <br /> grades, indications if they are public or private streets, and all proposed frontage <br /> improvements on existing and proposed streets; provide a typical street section for each <br /> Revised October 2018 Page 5 or 6 <br /> Prepared for the June 26, 2019, Planning Commission Meeting 20 <br /> 2019, Planning Commission Meeting 19 <br /> of 6 <br /> Prepared for the June 26, 2019, Planning Commission Meeting 18 <br /> goals established under SB 32 and EO S-3-05,implementation of the <br /> 26 <br />ntal <br /> 24 <br />iteria air pollutants <br /> 23 <br />