Laserfiche WebLink
EXHIBIT J: PUBLIC COMMENTS P Ep'S'4N�N_ <br /> and additional information can be obtained on the City's webpage at <br /> httD;Nwww.crtyofoleasantonca.govigovideptsfengineerinwstormwater.asp <br /> ❑ Arborist Report and Tree Survey: Provide two copies of the survey and arborist report.A <br /> survey of the existing trees on the site with a trunk diameter of six inches or greater,including <br /> size, species, and indication of which trees are to be removed note all`heritage"trees, with <br /> accurate trunk and drip lines noted.The survey must be accompanied by a tree report prepared <br /> by a City-approved Arborist A list of City-approved Arborists can be obtained on the City's <br /> webpage at: htta:llwwwcitvofoleasantonca,aoviresidentitreee.aeo.All trees need to be labeled <br /> by number and tagged on-site per ISA standards More information can be found via the City's <br /> website under the Landscape Architect Division webpage. <br /> EJ Traffic Analysis: A traffic analysis prepared by a certified traffic engineer may be required for <br /> certain developments.Applicant is responsible for funding the traffic analysis, (Consult with <br /> Planning staff to determine if applicable for your project) <br /> ❑ Sustainability Checklist: A completed LEED or GreenPoint checklist applicable to your <br /> project will be required Green building measures are required to be submitted for new single- <br /> family residential construction 2,000 square feet or more in size or new commercial construction <br /> 20.000 square feet or more in size.The City's Green Building requirements apply to all multi- <br /> family residential projects of any size of number of units. <br /> n Colors and Materials Board: Submit aboard to illustrate the colors and materials to be used <br /> on the project. Include samples of actual colors and materials on 8'x 114 foam board to be <br /> retained by the City as part of the permanent file, <br /> Story Pole or Ground Staklnb:Submit a story pole or ground staking plan(certified by a <br /> Cal lorr,ia Licensed Surveyor or Civil Engineer)showing the layout, height and location of all <br /> proposed structures. a minimum of 14-days prior to the first public hearing.Submit photographs <br /> of the story poles from the most visible public vantage points and surrounding residences. <br /> Consult with Planning staff to determine if aoplirab/e for your project.) <br /> • Housino Projects,Reuulatonr Conformance Analysis;Additional information may be <br /> required for the following types of projects: a.)A'Housing Project'as defined pursuant to <br /> Assembly Bill 678/Assembly Bill 1515/Senate Bill 167(Housing Accountability Act); b.)A project <br /> requesting stream:ined project review under the provision of Senate Sill 35; or c.)A project <br /> proposing development an any multi-family housing opportunity site as identified in the City of <br /> Pleasanton Housing Element Background Report(January 2015)(Housing Element Site),as <br /> follows. <br /> a. Applications for any of the above project types: An analysis of the proposed project's <br /> conformance to ay applicable objective,quantifiable, written development standards, <br /> guidelines, conditions,and policies.At a minimum, define how the project complies with the <br /> General Plan, applicable specific plan, design requirements, use requirements,floor area <br /> standards,density, setbacks, height standards, landscaping standards, creek setbacks, tree <br /> preservation and protection standards,water efficient landscaping requirements,stormwater <br /> requirements, and common open space,private useable open space, and public open <br /> space requirements. <br /> b. Applications requesting streamlined review under SB35 shall clearly state such in their <br /> project narrative, and the application shall provide an analysis of eligibility for streamlining, <br /> including conformance with each of the criteria specified in Government Code Section <br /> 65913.4(a). <br /> c. Applications for development on any Housing Element Site:An analysis of the proposed <br /> project density and affordability(number of units, by affordability level)as compared to that <br /> Revised October 2018 Page 3 of 6 <br /> Prepared for the June 26, 2019, Planning Commission Meeting 18 <br /> goals established under SB 32 and EO S-3-05,implementation of the <br /> 26 <br />ntal <br /> 24 <br />iteria air pollutants <br /> 23 <br />