Laserfiche WebLink
Mitigation Monitoring and Reporting Program for the City of Pleasanton Downtown Specific Plan <br /> Impact Mitigation Measure Method of Verification Timing of Responsibility for Verification Complete <br /> Verification Verification Date Initial <br /> Boulevard at Valley proposed. City shall Traffic <br /> Avenue/Junipero Street require payments of Engineering <br /> extending beyond the Transportation Division <br /> available storage in the Impact Fees as <br /> AM peak hour in the applicable. <br /> cumulative with project <br /> condition. <br /> Construction of bicycle TRA-9:Conduct a feasibility study for City shall conduct a Immediately City of <br /> facilities proposed by the the proposed bicycle and pedestrian feasibility study for following Pleasanton <br /> Proposed Plan would facilities in the Proposed Plan.Should the proposed approval of Community <br /> not be consistent with the facilities be deemed feasible,amend bicycle and Downtown Development <br /> the bicycle facilities the City's Bicycle and Pedestrian Master pedestrian facilities. Specific Plan Department, <br /> contemplated for the Plan to reflect the bicycle and pedestrian City shall amend Traffic <br /> downtown area in the improvements included in the Proposed either the City's Engineering <br /> City's Bicycle and Plan. Should improvements been Bicycle and Division <br /> Pedestrian Master Plan. deemed infeasible, amend the Proposed Pedestrian Master <br /> Plan. Plan or the <br /> Proposed Plan to <br /> reflect the findings <br /> of the study. <br /> I3 <br /> left-turn pocket through applicant Pleasanton <br /> would result in vehicle to 300-feet or construct a second traffic studies as Community <br /> queues at the northbound left-turn lane and associated development Development <br /> intersection of Sunol receiving lane. projects are Department, <br /> l2 <br /> projects are Department, <br /> Avenue/Old Bernal proposed. City shall Traffic <br /> Avenue at Bernal require payments of <br /> II <br />s are Department, <br /> and southbound left-turn proposed. City shall Traffic <br /> queues are projected to require payments of Engineering <br /> exceed the available Transportation Division <br /> storage.The addition of Impact Fees as <br /> the Proposed Plan traffic applicable. <br /> would increase the <br /> 10 <br />l project-related mitigation measures. <br />ption of Statement of Overriding Considerations <br /> The City Council has weighed the economic,legal,social,technological,and other benefits of the proposed <br /> Plan,as set forth above in Section II.D,against the significant unavoidable impacts of the Plan identified in <br /> the Draft EIR(and discussed above in Section II.A). <br /> The City Council hereby determines that those benefits outweigh the risks and adverse environmental <br /> impacts of the Plan,and further determines that the Plan's significant unavoidable impacts are acceptable. <br /> Accordingly, the City Council adopts the Statement of Overriding Considerations, recognizing that <br /> significant unavoidable impacts will result from implementation of the Plan.Having(i)adopted all feasible <br /> mitigation measures,as stated herein and discussed in the Draft EIR;(ii) rejected alternatives to the Plan, <br /> as stated herein and discussed in the Draft EIR;and(iii) recognized the significant unavoidable impacts of <br /> the Plan, the City Council hereby finds that each of the separate benefits of the proposed Plan, as stated <br /> herein, is determined to be unto itself an overriding consideration, independent of other benefits, that <br /> warrants approval of the Plan and outweighs and overrides its significant unavoidable impacts,and thereby <br /> justifies the approval of the City of Pleasanton Downtown Specific Plan. <br /> 27 <br />would result in an operational emissions increase of 4,000 <br /> MTCO2e per year and an energy consumption increase of 168,000 million BTU per year compared <br /> to existing conditions. While the Plan would not be sufficient to align downtown Pleasanton's <br /> emissions trajectory with the goals established under SB 32 and EO S-3-05,implementation of the <br /> 26 <br />ntal <br /> 24 <br />iteria air pollutants <br /> 23 <br />