Laserfiche WebLink
���E p` _N Downtown Specific Plan Update <br /> SAN Pleasanton Municipal Code Amendments <br /> 1[P L -_TON <br /> EXHIBIT H—ATTACHMENT 1 <br /> increase by 4 dB Ldn. The zoning administrator may request a noise study or other <br /> professional study in order to determine whether the use meets or exceeds this <br /> threshold. <br /> A use is specifically subject to a conditional use permit shall be processed as such. A <br /> use not specifically subject to a conditional use permit that cannot meet condition 4 <br /> shall be subject to a conditional use permit. <br /> 6 Music and art schools shall be at least 150 feet from an R district. <br /> 7 The facilities shall be tested from 8:00 a.m. to 5:00 p.m. Monday through Friday or <br /> from 10:00 a.m. to 12:00 noon on Saturday or Sunday only, the facilities shall not be <br /> tested for more than one hour during any day, testing shall occur a maximum of once <br /> a month, and no testing shall be on "Spare the Air Days" in Alameda County. <br /> 8 Small electricity generator facilities shall meet the following criteria: (1)The fuel source <br /> for the generators shall be natural gas, biodiesel, or the byproduct of an approved <br /> cogeneration or combined cycle facility; (2) The facilities shall use the best available <br /> control technology to reduce air pollution; (3) The facilities shall not create any <br /> objectionable odors at any point outside of the property plane where the facilities are <br /> located; (4) The facilities shall not exceed a noise level of 45 dBA at any point on a <br /> residentially zoned property outside of the property plane where the facilities are <br /> located; (5) On a site with fuel cell facilities, small electricity generator facilities shall <br /> not be permitted unless the aggregate wattage of the two facilities is less than one <br /> megawatt. If the aggregate wattage of the two facilities is one megawatt or greater, the <br /> small electricity generator facilities shall be subject to all requirements and processes <br /> prescribed in this title for medium or large electricity generator facilities, whichever is <br /> the most applicable, in the subject zoning district; (6) The facilities shall be <br /> cogeneration or combined cycle facilities, if feasible. <br /> 9 Small fuel cell facilities shall meet the following criteria: (1)The facilities shall not create <br /> any objectionable odors at any point outside of the property plane where the facilities <br /> are located; (2) The fuel cell facilities shall not exceed a noise level of 45 dBA at any <br /> point on any residentially zoned property outside of the property plane where the <br /> facilities are located; (3) On a site with electricity generator facilities, small fuel cell <br /> facilities shall not be permitted unless the aggregate wattage of the two facilities is less <br /> than one megawatt. If the aggregate wattage of the two facilities is one megawatt or <br /> greater, the small fuel cell facilities shall be subject to all requirements and processes <br /> prescribed in this title for medium or large fuel cell facilities, whichever is the most <br /> applicable, in the applicable subject district; Small fuel cell facilities are encouraged to <br /> be cogeneration or combined cycle facilities. <br /> 10 These uses include: <br /> a. Indoor special downtown accessory entertainment uses with non-amplified or <br /> amplified sound in the downtown hospitality central core area and non-amplified <br /> sound in the downtown hospitality transition area (hours: 8:00 a.m.-11:00 p.m.); <br /> b.Indoor special downtown accessory entertainment uses with amplified sound in the <br /> downtown hospitality transition area (hours: 8:00 a.m.-9:00 p.m.); <br /> c. Outdoor special downtown accessory entertainment uses (hours: 8:00 a.m.-9:00 <br /> p.m.). <br /> Prepared for the June 26,2019 Planning Commission Meeting 10 <br />