My WebLink
|
Help
|
About
|
Sign Out
ORD 1902
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1901 - 2000
>
ORD 1902
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:23:46 PM
Creation date
3/9/2004 11:49:01 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
3/2/2004
DOCUMENT NO
ORD 1902
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
76. <br /> <br />Building and site plans are to be submitted to the Building and Safety <br />Division on computer disk in a format approved by the Chief Building <br />Official. Digitized information shall be submitted before requesting a final <br />inspection and should reflect as-built situs and architectural information as <br />approved by the Director. <br /> <br />77. <br /> <br />The developer acknowledges that the City of Pleasanton does not guarantee <br />the availability of sufficient sewer capacity to serve this development by <br />the approval of this case, and that the developer agrees and acknowledges <br />that building permit approval may be withheld if sewer capacity is found by <br />the City to not be available. <br /> <br />78. <br /> <br />This approval does not guarantee the availability of sufficient water to serve <br />the project. The City shall withhold building permits for the project if at <br />the time building permits are ready to issue, mandatory water rationing is in <br />effect, unless the City has adopted a water offset program and unless the <br />developer is participating in the program. Notwithstanding the developer's <br />participation in such a program, the City may withhold building permits if <br />the City determines that sufficient water is not available at the time building <br />permits are ready to issue. <br /> <br />FIRE <br /> <br />79. <br /> <br />An automatic fire sprinkler system shall be installed in the building unless <br />otherwise determined by the Chief Building Official and the Fire Marshal. <br />Plans and specifications for the automatic fire sprinkler system shall be <br />submitted to the Pleasanton Building and Safety Division for review and <br />approval prior to installation. The fire alarm system, including waterflow <br />and valve tamper, shall have plans and specifications submitted to the <br />Pleasanton Fire and Safety Division for review and approval prior to <br />installation. All required inspections and witnesses of tests shall be <br />completed prior to final inspection and occupancy of the building(s). The <br />fire alarm system shall transmit zone information to a UL listed Central <br />Station as specified in the Ordinance. <br /> <br />80. <br /> <br />As required by the Fire Chief, all sprinkler and back flow prevention Fire <br />Department connections (FDC) shall be placarded with the address(es) it <br />serves. The placard shall be submitted with the signage package for the site <br />and shall have numerals on a contrasting background. All placards are <br />subject to the review of the Fire Chief. <br /> <br />PUD-30, Valley Park Associates, Conditions of Approval, 2/17/2004 Page 13 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.