My WebLink
|
Help
|
About
|
Sign Out
PC-2019-10
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2010-2019
>
2019
>
PC-2019-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2019 11:40:07 AM
Creation date
6/13/2019 11:39:56 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
4/24/2019
DESTRUCT DATE
PERMANENT
DOCUMENT NO
PC-2019-10
NOTES
P18-0340, SIMON PROPERTIES ON BEHALF OF STONERIDGE PROPERTIES, LLC
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
prepared by a California licensed civil engineer, which include but is not limited to the type, <br /> location, and sizing calculations of the treatment controls that will be installed. Full trash capture <br /> devices shall be a part of the "Stormwater Treatment Measures and Maintenance Agreement." <br /> 134. RESTAURANTS AND FOOD ESTABLISHMENTS: The applicant shall provide a contained area <br /> for cleaning mats, containers and equipment. The wash area shall be covered or designed to <br /> prevent runoff onto or from the area. The area shall be connected to the sanitary sewer system, <br /> subject to approval by the Dublin San Ramon Services District, or the cleaning mats, containers <br /> and equipment shall be collected in a containment area and removed regularly by a disposal <br /> and recycling service. If connected to the sanitary sewer, a grease abatement device (grease <br /> trap or interceptor) shall be installed, and a sign shall be posted prohibiting the dumping of <br /> hazardous materials. <br /> 135. OUTDOOR LOADING AREAS: All outdoor loading areas shall be covered. No other area shall <br /> drain into the loading area. A containment berm or curb shall be constructed to prevent such <br /> drainage, if found necessary by the Director of Engineering/City Engineer. The loading area <br /> may be required to drain to the sanitary sewer if required by the Director of Engineering/City <br /> Engineer, subject to approval by the Dublin San Ramon Services District. If connected to the <br /> sanitary sewer, an isolation valve shall be installed between the drain structure and the sanitary <br /> sewer, a structural control such as a sand filter or oil water separator shall be used, and a sign <br /> shall be posted prohibiting the dumping of hazardous materials. <br /> 136. CONSTRUCTION COMPLETION: Prior to occupancy, the applicant shall provide the following <br /> documents to the City Inspector: <br /> a. A letter prepared and signed by the applicant's engineer of record certifying the <br /> project permanent stormwater treatment measures and Hydromodification <br /> Management (HM) measures, if applicable, have been installed in accordance with <br /> the City approved improvement plans. Photographs shall be taken of all the <br /> stormwater treatment measures and HM measures, if applicable, and identified by <br /> matching the identification number stated in the city accepted improvement plans. <br /> b. Signed and completed construction Project Completion Inspection Checklist <br /> c. Bio retention soil certification form completed and certified by the applicant's soil <br /> supplier. <br /> [end] <br /> P18-0340 Planning Commission <br /> Page 20 of 20 <br />aste/composting shall be enclosed and roofed per the city's trash enclosure design guidelines <br /> available on the City's website and as required by the NPDES Permit No. CAS612008 and <br /> amendments, issued by the San Francisco Bay Regional Water Quality Control Board. The <br /> trash enclosure shall be constructed to prevent stormwater run-on and runoff and to contain <br /> litter and trash, so that it is not dispersed by the wind or runoff during waste removal. The area <br /> enclosed shall drain to the sanitary sewer system and an area drain shall be installed in the <br /> enclosure area, providing a structural control such as an oil/water separator or sand filter. No <br /> other area shall drain into the trash enclosure. A sign shall be posted prohibiting the dumping of <br /> hazardous materials into the sanitary sewer. <br /> 133. FULL TRASH CAPTURE DEVICES: The applicant shall install trash capture devices at each <br /> upstream connection point to the public storm drain system subject to the review and approval <br /> of the Director of Engineering/City Engineer. The proposed treatment controls shall also prevent <br /> the discharge of trash to the downstream municipal separate storm sewer systems and <br /> receiving waters. Discharge points from these treatment control facilities, including overflows, <br /> shall be appropriately screened (5 mm mesh screen) or otherwise configured to meet the full <br /> trash capture screening specification for storm flows up to the full trash capture 1-year, 1-hour <br /> storm hydraulic specification, in compliance with the NPDES Permit No. CAS612008. The <br /> applicant shall submit a Stormwater Management Plan as part of the improvement plans <br /> P18-0340 Planning Commission <br /> Page 19 of 20 <br />