Laserfiche WebLink
the Director of Engineering/City Engineer and prior to City Council acceptance of public <br /> improvements. <br /> 122. PRIVATE EASEMENTS: The applicant shall record private access, drainage, and utility <br /> easements across the project for the benefit of the individual lots as determined by, subject to <br /> the review and approval by, and at a time determined by the Director of Engineering/City <br /> Engineer. <br /> 123. UTILITY VAULTS: The applicant shall set existing and proposed utility vaults to the grade of <br /> adjacent curb and/or sidewalk as determined by and subject to the review and approval of the <br /> Director of Engineering/City Engineer and prior to City Council acceptance of public <br /> improvements. <br /> Fees and Bonds <br /> 124. IMPROVEMENT PLAN AND LOT LINE ADJUSTMENT REVIEW FEES: The applicant shall pay <br /> all applicable plan check review fees to the Engineering Department with the first submittal of <br /> the improvement plans and grading plans. <br /> 125. EROSION CONTROL AND HAZARD MITIGATION BOND: The applicant shall submit a <br /> refundable cash deposit to the Engineering Department for erosion control and hazard <br /> mitigation in an amount determined by the Director of Engineering/City Engineer prior to <br /> issuance of a encroachment or grading permit, whichever occurs first. The City will retain the <br /> cash deposit until all work is substantially complete, all areas are stabilized, and all hazards are <br /> mitigated to the satisfaction of the Director of Engineering/City Engineer. <br /> Stormwater and Provision C.3 of the National Pollutant Discharge Elimination System Permit <br /> 126. STORMWATER TREATMENT: The project creates and/or replaces 10,000 square feet or more <br /> of impervious surface (collectively over the entire project site) and shall comply with Section <br /> "C.3.b Regulated Projects" of the NPDES Permit No. CAS612008, and amendments, issued by <br /> the San Francisco Bay Regional Water Quality Control Board. The improvements plans shall <br /> include the Stormwater Management Plan prepared by a California licensed civil engineer, <br /> indicating the type and locations of stormwater treatment measures to be installed (numbered <br /> sequentially for identification purposes), and sizing calculations. The Stormwater Management <br /> Plan shall be subject to review and acceptance by the Director of Engineering/City Engineer, <br /> prior to the issuance of an engineering or building permit, whichever occurs first. <br /> 127. STORMWATER TREATMENT MEASURES INSPECTION AND MAINTENANCE <br /> AGREEMENT: The applicant shall enter into a "Stormwater Treatment Measures Inspection and <br /> Maintenance Agreement" for annual maintenance and reporting of the stormwater treatment <br /> system as depicted on the improvement plans City-approved by the Director of Engineering/City <br /> Engineer. The agreement shall be filed for record at the Alameda County Clerk-Recorder's <br /> Office at a time determined by the Director of Engineering/City Engineer. <br /> 128. HYDROMODIFICATION MANAGEMENT: The project will create and/or replace 1 acre or more <br /> of impervious surface and increase the total impervious surface area over the pre-project <br /> surface area and shall comply with Section "C.3.g Hydromodification Management" of NPDES <br /> Permit No. CAS612008 and amendments, issued by the San Francisco Bay Regional Water <br /> Quality Control Board, except where on the three provisions stated in the permit applies. Post <br /> construction stormwater runoff shall drain to approved permanent Hydromodification <br /> Management (HM) controls to mitigate increases in peak runoff flow and increased runoff <br /> P18-0340 Planning Commission <br /> Page 18 of 20 <br />hment and haul route permit from the Engineering Department prior to moving <br /> equipment to the project site or performing work in the public right of way or within public <br /> easements. The applicant's contractor shall submit a completed and signed encroachment <br /> P18-0340 Planning Commission <br /> Page 16 of 20 <br /> Planning Commission <br /> Page 6 of 20 <br />