Schedule <br /> If City Council directs staff to finalize the design of this project, the plans and <br /> specifications can be completed by mid-to-late fall. However, this does not leave <br /> adequate dry weather time to complete construction before winter. As it is envisioned <br /> the project would be constructed before the existing parking lot is taken out of service <br /> and reconstructed, therefore leaving the existing parking in place until the retaining wall <br /> and concrete paths on the west side are completed. It is conceivable that construction <br /> could start in late fall, stop for winter, then continue with construction of the parking lot in <br /> the spring. Staff would need to explore this option with the adjacent property <br /> owners/businesses, but based upon discussions that have already occurred, it is likely <br /> they will prefer that all work be deferred to the spring and completed as rapidly as <br /> possible thereafter rather than have a prolonged construction period. <br /> If City Council directs staff to stop work on the current design and consider other <br /> alternatives, a schedule will be developed at a later time. <br /> Submitted by: Fiscal Review: Approvedad-a/41 <br /> •y: <br /> fut <br /> Stephen Kirkpatrick Tina Olson Nelson Fialho <br /> Director of Engineering Director of Finance City Manager <br /> Attachments: <br /> 1. Attachment One - Downtown Parking Lot 65 Percent Design <br /> 2. Attachment Two - 90-degree and Parallel Parking Lot Design <br /> Page 10 of 10 <br />