Laserfiche WebLink
EXHIBIT A <br /> SCOPE OF WORK <br /> 1. Street Sweeping <br /> Street sweeping - Sweeping will be scheduled Monday through Friday only. Sweeping of <br /> residential areas shall not start before 8:00 a.m. or continue after 4:30 p.m. Commercial areas <br /> shall be swept between 7:00 p.m. and 6:00 a.m. Sweeping shall be scheduled to maximize the <br /> areas of streets being swept by minimizing the interference by parked vehicles. <br /> Downtown Route - Downtown sweeping shall be twice a week on Mondays and Fridays between <br /> 5:30 a.m. and 7:00 a.m. Main Street(from Bernal Avenue North to Stanley Boulevard) shall <br /> have the entire street surface swept, from curb to curb, including areas within button-designated <br /> medians and the side streets (between Peters Avenue to Main Street, First Street to Main Street, <br /> and Railroad Avenue to Main Street). The Operations Superintendent may require revisions in <br /> the hours and/or manner of operation necessary to maximize sweeping coverage, to minimize <br /> noise complaints or to coincide with City staff working hours. <br /> Holidays - There will be no sweeping on the following observed holidays: <br /> • New Year's Day <br /> • Martin Luther King Jr. Day <br /> • Presidents' Day <br /> • Memorial Day <br /> • Independence Day <br /> • Labor Day <br /> • Thanksgiving <br /> • Christmas <br /> The City will work with the Contractor to identify the makeup date to no conflict with the garbage <br /> pickup days. <br /> Scheduled Service & Sweeping Routes - The City shall provide a street sweep schedule and the <br /> sweeping routes shall be adhered to by the Contractor. Areas scheduled for sweeping shall not <br /> coincide with same day garbage pick-up service. All designated streets require sweeping along the <br /> curb and gutter and require sweeping along the median curb. After execution of the contract, City <br /> may add or delete other streets or portions of streets at the agreed Agreement rate identified in <br /> Attachment A. The City may request a change in the schedule within seven (7) day advance notice <br /> to Contractor. <br /> Unscheduled Service - The Contractor will also provide, if required by the City, unscheduled <br /> sweeping of any street(s) or portions of streets at a rate identified in Attachment A. The City may <br /> request sweeping for construction debris. The City will give Contractor a minimum of twenty-four <br /> (24) hour notice for such unscheduled sweeping. <br /> Additional Route Sweeping - From November to January of each year, the Contractor shall provide <br /> two (2) sweepers with an operator for each sweeper. The actual dates to be determined by the <br /> Operations Superintendent or designee. <br /> Page I6 <br />