Laserfiche WebLink
EXHIBIT A <br /> A. SCOPE <br /> 1. Trash Collection. Provide trash collection at various parks and trails <br /> located throughout Pleasanton. Reline trash receptacles with a new liner and haul <br /> trash to Pleasanton Garbage Services. <br /> 2. Recyclables Collection. Provide recyclable collection at various parks <br /> and trails located throughout Pleasanton. There are currently no recycle <br /> receptacles in Pleasanton parks and trail facilities. Reline trash receptacles <br /> with a new liner and haul trash to Pleasanton Garbage Services. <br /> 3. Cleanup. Before Contractor leaves each site, no trash or recyclables shall <br /> remain near receptacle. <br /> 4. Supervision and Management. Respond to questions and resolve <br /> problems as they arise. <br /> 5. Updates. On a schedule to be determined by the Parks Superintendent, <br /> provide updates on all current and future activities to the Parks Superintendent. <br /> All work is performed in accordance with City Specifications and requirements, <br /> and at the direction of the Parks Superintendent. <br /> B. SPECIFIC REQUIREMENTS <br /> 1. General <br /> a. Contractor shall diligently collect all waste in trash receptacles, <br /> reline receptacles with a new plastic liner and haul trash off site to <br /> Pleasanton Garbage. Such services shall include providing labor, <br /> equipment, supplies, and transportation for such work force, and the <br /> necessary means of hauling trash to the designated site from the City park <br /> and trail locations described in Schedule B. Schedule B also includes <br /> information regarding the number of trash receptacles to be serviced and <br /> the frequency of service. <br /> b. Contractor shall diligently collect all recyclable material from <br /> recycle receptacles, reline receptacles with a new plastic liner and haul <br /> material off site to a mix waste processing facility as defined by Alameda <br /> County Ordinance 2012-1. Contractor is obligated to insure materials are <br /> properly sorted and recycled. Such services shall include providing labor, <br /> equipment, supplies, and transportation for such work force, and the <br /> necessary means of hauling recyclables from the City park and trail <br /> locations described in Schedule B. There are currently no recycle <br /> receptacles in Pleasanton parks and trail facilities. During the course of <br /> this contract, the City anticipates the installation of new recycle <br /> receptacles next to existing trash receptacles at many of the facilities. <br />