Laserfiche WebLink
Tree Appraisal <br /> Trunk Heritage Appraised <br /> Tree No. Species <br /> Diameter(in.) Tree? Value <br /> 1 Crape Myrtle 7 No $ 450.00 <br /> 2 Italian alder 7,8,8 No $ 700.00 <br /> 3 Sweetgum 8 No $ 1,050.00 <br /> 4 Plum 3,3,2,2,1,1,1 No $ 100.00 <br /> 5 Lemon 3,3,2,1 No $ 350.00 <br /> 6 Plum 10,10 Yes $ 2,050.00 <br /> 7 Windmill palm 10 No $ 1,400.00 <br /> 8 Windmill palm 9 No $ 1,150.00 <br /> 9 Windmill palm 10 No $ 1,400.00 <br /> 10 Glossy privet 3,3,3,3 2,2,1 No $ 100.00 <br /> 11 Windmill palm 10 No $ 950.00 <br /> 12 Windmill palm 10 No $ 950.00 <br /> 13 Windmill palm 10 No $ 950.00 <br /> 14 Windmill palm 10 No $ 950.00 <br /> 15 Windmill palm 8 No $ 800.00 <br /> 16 Plum 5,5 No $ 350.00 <br /> 17 Valley oak 36 Yes $ 34,750.00 <br /> 18 Valley oak 38 Yes $ 48,750.00 <br /> 19 California black walnut 17,12 No $ 2,850.00 <br /> Total $ 100,050.00 <br />sy privet 3,3,3,3 No 3 Moderate Multiple trunks arise from base;one branch decay at 6';metal <br /> 2,2,1 fence post embedded in N trunk. <br /> 11 Windmill palm 10 No 4 High 20'brown trunk. <br /> 12 Windmill palm 10 No 4 High 25'brown trunk. <br /> 13 Windmill palm 10 No 4 High 25'brown trunk. <br /> 14 Windmill palm 10 No 4 High 20'brown trunk. <br /> 15 Windmill palm 8 No 4 High 25'brown trunk. <br /> 16 Plum 5,5 No 3 Low Poor form and structure;leans N;codominant trunks arise from 4'. <br /> 17 Valley oak 36 Yes 4 High Off-site;tag on fence;canopy hangs over 5'. <br />st remain outside TREE PROTECTION <br /> ZONE at all times. <br /> 8. Any root pruning required for construction purposes shall receive the prior approval of and <br /> be supervised by the Project Arborist. Roots should be cut with a saw to provide a flat and <br /> smooth cut. Removal of roots larger than 2" in diameter should be avoided. If roots 2"and <br /> greater in diameter are encountered and during site work must be cut to complete the <br /> construction, the Project Arborist must be consulted to evaluate effects on the health and <br /> stability of the tree and recommend treatment. <br /> 9. If injury should occur to any tree during construction, it should be evaluated as soon as <br /> possible by the Project Arborist so that appropriate treatments can be applied. <br /> 10. No excess soil, chemicals, debris, equipment or other materials shall be dumped or stored <br /> within the TREE PROTECTION ZONE. <br /> 11. Any additional tree pruning needed for clearance during construction must be performed <br /> by a Certified Arborist and not by construction personnel. <br /> 12. Trees that accumulate a sufficient quantity of dust on their leaves, limbs and trunk as <br /> judged by the Project Arborist shall be spray-washed at the direction of the Project <br /> Arborist. <br /> 13. All trees shall be irrigated on a schedule to be determined by the Project Arborist(every 3 <br /> to 6 weeks during the warm season is typical). Each irrigation shall wet the soil within the <br /> TREE PROTECTION ZONE to a depth of 30". <br />xtracting the trees, or grinding the stump below ground. <br /> 7. Structures and underground features to be removed within the 10' of a tree shall use <br /> equipment that will minimize damage to trees above and below ground, and operate from <br /> outside the Tree Protection Zone. Tie back branches and wrap with protective materials <br /> to protect from injury as directed by the Project Arborist. The Project Arborist shall be on- <br /> site during all operations within the Tree Protection Zone to monitor demolition activity. <br />spection. The location factor <br /> considers the site, placement and contribution of the tree in its surrounding landscape. <br />