My WebLink
|
Help
|
About
|
Sign Out
5_Exhibits A-C
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2010-2019
>
2019
>
06-12
>
5_Exhibits A-C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2019 9:27:18 AM
Creation date
6/5/2019 9:27:03 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/12/2019
Document Relationships
5
(Message)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2010-2019\2019\06-12
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Updated Arborist Report HortScience I Bartlett Consulting <br /> Sarvana Chilla, 3987 Stanley Page 10 <br /> Maintenance of impacted trees <br /> Trees preserved at the Stanley site may experience a physical environment different from that of <br /> pre-development. As a result, tree health and structural stability should be monitored. <br /> Occasional pruning, fertilization, mulch, pest management, replanting and irrigation may be <br /> required. <br /> Summary <br /> You are planning to construct three residential buildings on the property. Four trees are <br /> considered to be Heritage as defined by the City of Pleasanton. I recommend that eight trees be <br /> removed, one of which is in poor condition. I recommend preservation of nine, including two off- <br /> site trees. <br /> Tree#18 can be retained with the recommendations for the design change, including no turf or <br /> grade change within 10' of the tree. Tree#1 is an off-site tree and approaching the neighbor is <br /> recommended. Two trees are located on the east portion of the yard, adjacent to the proposed <br /> driveway. Tree vigor and overall structure of tree#1 was fair and tree#18 was good. At its <br /> closest point, the footprint will be within the trunk. Impacts from the project to the tree will come <br /> primarily from excavation for the driveway foundation. The driveway will impact crape myrtle (#1). <br /> I established the appraised value of these two trees as $49200. Preliminary Tree Preservation <br /> Guidelines are provided. <br /> Please contact me with any questions. I look forward to hearing from you. <br /> Sincerely, <br /> Maryellen Bell <br /> ISA Certified Arborist WE-5643A <br /> Attached: Tree Assessment Map <br /> Tree Assessment Form <br /> Tree Appraisal <br /> diameter will occur within the TREE PROTECTION ZONE. <br /> 7. Construction trailers, traffic and storage areas must remain outside TREE PROTECTION <br /> ZONE at all times. <br /> 8. Any root pruning required for construction purposes shall receive the prior approval of and <br /> be supervised by the Project Arborist. Roots should be cut with a saw to provide a flat and <br /> smooth cut. Removal of roots larger than 2" in diameter should be avoided. If roots 2"and <br /> greater in diameter are encountered and during site work must be cut to complete the <br /> construction, the Project Arborist must be consulted to evaluate effects on the health and <br /> stability of the tree and recommend treatment. <br /> 9. If injury should occur to any tree during construction, it should be evaluated as soon as <br /> possible by the Project Arborist so that appropriate treatments can be applied. <br /> 10. No excess soil, chemicals, debris, equipment or other materials shall be dumped or stored <br /> within the TREE PROTECTION ZONE. <br /> 11. Any additional tree pruning needed for clearance during construction must be performed <br /> by a Certified Arborist and not by construction personnel. <br /> 12. Trees that accumulate a sufficient quantity of dust on their leaves, limbs and trunk as <br /> judged by the Project Arborist shall be spray-washed at the direction of the Project <br /> Arborist. <br /> 13. All trees shall be irrigated on a schedule to be determined by the Project Arborist(every 3 <br /> to 6 weeks during the warm season is typical). Each irrigation shall wet the soil within the <br /> TREE PROTECTION ZONE to a depth of 30". <br />xtracting the trees, or grinding the stump below ground. <br /> 7. Structures and underground features to be removed within the 10' of a tree shall use <br /> equipment that will minimize damage to trees above and below ground, and operate from <br /> outside the Tree Protection Zone. Tie back branches and wrap with protective materials <br /> to protect from injury as directed by the Project Arborist. The Project Arborist shall be on- <br /> site during all operations within the Tree Protection Zone to monitor demolition activity. <br />spection. The location factor <br /> considers the site, placement and contribution of the tree in its surrounding landscape. <br />