My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2019
>
050719
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2019 4:09:10 PM
Creation date
4/30/2019 4:09:03 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
5/7/2019
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
37. WATER FEES AND WATER METER CONNECTION FEES: The applicant shall pay the <br /> applicable Zone 7 and City connection fees and water meter cost for any water meters and <br /> irrigation meters, if applicable, prior to building permit issuance. <br /> 38. SEWER FEES: The applicant shall pay the applicable Dublin-San Ramon Services District <br /> (DSRSD) and City sewer permit fees prior to building permit issuance. <br /> 39. SCHOOL IMPACT FEES — RESIDENTIAL NEW CONSTRUCTION: Applicant shall work with the <br /> Pleasanton Unified School District (PUSD) to develop a program to offset this project's long term <br /> effect on school facility needs in Pleasanton. This program shall be designed to fund school <br /> facilities necessary to offset this project's reasonably related effect on the long-term need for <br /> expanded school facilities. The method and manner for the provision of these funds and/or <br /> facilities shall be approved by the PUSD and in place prior to building permit issuance. Written <br /> proof of compliance with this condition shall be provided by applicant to the City, on a form <br /> generated by the PUSD, prior to building permit issuance. <br /> ENGINEERING DEPARTMENT — LAND DEVELOPMENT— 925-931-5650 <br /> Design <br /> 40. DESIGN PER CITY STANDARDS: All public improvements shall be designed in compliance with <br /> the City Standard Specifications and Details in effect at the time of the issuance of the <br /> encroachment, grading, or subdivision permit, whichever occurs first. <br /> 41. DUST CONTROL PLAN: The applicant shall submit a written dust control plan or procedure with <br /> the first submittal of the grading and improvement plans to the Engineering Department subject to <br /> the review and approval of the Director of Engineering/City Engineer. <br /> 42. RETAINING WALLS: All retaining walls along the street shall be located behind the public service <br /> easement (PSE), unless otherwise approved by the Director of Engineering/City Engineer. All <br /> retaining walls with a minimum height of 4 feet, measured from the bottom of the footing to the <br /> finished grade at the top of the wall, and all retaining walls with a surcharge shall be designed by <br /> a California licensed civil or structural engineer <br /> Construction <br /> 43. CONSTRUCTION PER CITY STANDARDS: All public improvements shall be constructed in <br /> compliance with the City Standard Specifications and Details in effect at the time of the issuance <br /> of the encroachment, or grading permit, whichever occurs first. <br /> 44. ENCROACHMENT AND HAUL ROUTE PERMITS: The applicant's contractor shall obtain an <br /> encroachment and haul route permit from the Engineering Department prior to moving equipment <br /> to the project site or performing work in the public right of way or within public easements. The <br /> applicant's contractor shall submit a completed and signed encroachment permit application <br /> accompanied with six copies of City-approved improvement plans, proof of insurance with <br /> endorsement adding the City as an additional insured, a copy of a valid City of Pleasanton <br /> business license, applicable fees. and other requirements determined by the Director of <br /> Engineering/City Engineer. <br /> 45. DAMAGE TO EXISTING PUBLIC AND PRIVATE IMPROVEMENTS: The applicant shall repair <br /> damage to existing public and private improvements on and near the project site and along the <br /> haul route at their full expense caused by construction activities as determined and to the <br /> satisfaction of the Director of Engineering/City Engineer. <br /> PUD-131 <br /> Page 7 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.