My WebLink
|
Help
|
About
|
Sign Out
3
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2010-2019
>
2019
>
04-24
>
3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2019 12:54:06 PM
Creation date
4/17/2019 11:26:37 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/24/2019
Document Relationships
3_Exhibit B - Plans
(Attachment)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2010-2019\2019\04-24
3_Exhibits A, C & D
(Attachment)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2010-2019\2019\04-24
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Tutoring sessions are grouped in three "time zones:" weekday after-school tutoring, weekend <br /> tutoring, and summer break tutoring. The details of the tutoring schedules are described below: <br /> Weekday After-School Tutoring <br /> Weekday after-school tutoring would be offered Tuesdays through Thursdays from <br /> 3:30 p.m. - 7:45 p.m. No after-school tutoring would occur on Mondays or Fridays. Tutoring <br /> sessions would be held with staggered starting and ending times. There would be a maximum <br /> of 12 students in each classroom. The proposed after-school tutoring schedule is list in <br /> Table 1. <br /> Table 1: Weekday After-School Tutoring Schedule During Academic Year <br /> Tuesday Tuesday Tuesday Tuesday Tuesday <br /> Room 3:30 -5:15 PM 3:45-5:30 PM 4:00-5:45 PM 6:00 -7:45 PM 6:30 -8:15 PM <br /> 1 3rd Grade Math Alg 2 <br /> 2 4th Grade LA <br /> 3 <br /> 4 <br /> 5 <br /> 6 <br /> Wednesday Wednesday Wednesday Wednesday Wednesday <br /> Room 3:30 -5:15 PM 3:45 -5:30 PM 4:00 - 5:45 PM 6:00 -7:45 PM 6:30 - 8:15 PM <br /> 1 Preaigebra Geometry <br /> 2 4th Grade Math <br /> 3 5th Grade LA <br /> 4 <br /> 5 <br /> 6 <br /> Thursday Thursday Thursday Thursday Thursday <br /> Room 3:30 - 5:15 PM 3:45 -5:30 PM 4:00 -5:45 PM 6:00 -7:45 PM 6:30 - 8:15 PM <br /> 1 Sth Grade Math Algebra 1 <br /> 2 6th Grade LA MS Contest <br /> 3 Adv LA Seminar <br /> 4 <br /> 5 <br /> 6 <br /> P19-0008, 5200 Franklin Drive Planning Commission <br /> 5 of 11 <br /> III <br /> i II —room i! <br /> II Yom. L,, <br /> J <br /> I I I I a I a I r <br /> LE 34:1==yC Dq= n A=[ D <br /> I I I I U I I I L <br /> t11'-I' ti.'.-1' tli-t' ' t15'-6' <br /> NEW FLOOR PLAN <br /> Grade levels of students attending the facility range from elementary school through high <br /> school. As proposed, tutoring sessions are scheduled by grade level and by subject. <br /> P19-0008, 5200 Franklin Drive Planning Commission <br /> 4 of 11 <br /> March 25,2019 <br /> pLEASANTON. <br /> <br /> and major branches. They need to be inspected regularly by a professional <br /> to determine if weight needs to be removed from weak areas to reduce the <br /> risk of branch or trunk failure. <br /> Pruning and cabling should be undertaken by qualified arborist. Tree <br /> pruning companies must carry the California State Contractors License for <br /> Tree Services (#C61/D49). Any pruning should be performed by a Certified <br /> Arborist or Tree Worker and adhere to the Tree Pruning Guidelines of the <br /> International Society of Arboriculture. <br /> Irrigation <br /> irrigation per month). No plants should be installed within 10' of the trunk of <br /> the tree. A list of species appropriate for use under oaks is listed in Table 1. <br /> 4. Irrigation systems must be very carefully designed to avoid trenching <br /> through roots. No irrigation lines shall be placed under the driplines of <br /> HortScience,Inc E 325 Ray St. I Pleasanton, CA 94566 <br /> phone 925.484.0211 I fax 925.484.50961 www.hortscience.Com <br />ll not be placed within <br /> the TREE PROTECTION ZONE, either temporarily or permanently. Any modifications must <br /> be approved and monitored by the Consulting Arborist. <br /> 2. All demolition, excavation and construction within the dripline of trees shall be done using <br /> the smallest equipment possible. The Consulting Arborist will identify where hand <br /> excavation may be required. Motorized equipment shall not be used within the TREE <br /> PROTECTION ZONE. <br /> 3. Prior to excavation for the demolition and construction the tree may require root pruning <br /> outside the TREE PROTECTION ZONE by cutting all roots cleanly to the depth of <br /> construction. Roots will be exposed by either: pulling soil away from the tree by digging <br />, normally 54"above grade. A multi-branched tree, which has <br />