Laserfiche WebLink
ENVIRONMENTAL ASSESSMENT <br /> This project is categorically exempt (Section 15301, Class 1, Existing Facilities) from the <br /> requirements of the California Environmental Quality Act (CEQA). Therefore, no environmental <br /> document accompanies this report. <br /> SUMMARY/CONCLUSION <br /> As proposed and conditioned, staff believes that the proposed use will be compatible with and <br /> will not detrimentally affect the existing or future adjacent/nearby uses. Conditions of approval <br /> have been included which will ensure that the safety and general welfare of the surrounding <br /> area, and the City in general, is maintained. Staff conducted multiple site visits to the property <br /> and found there is sufficient parking on-site to accommodate the use. Staff believes that the <br /> proposed use will fulfill a community need and that the proposed location is appropriate. <br /> Primary Author: <br /> Jenny Soo, Associate Planner, 925-931-5615 orjsooCa�cityofpieasantonca.gov <br /> Reviewed/Approved By: <br /> Steve Otto, Senior Planner <br /> Ellen Clark, Planning Manager <br /> Julie Harryman, Assistant City Attorney <br /> Gerry Beaudin, Community Development Director <br /> P19-0008, 5200 Franklin Drive Planning Commission <br /> 11 of 11 <br />a condition that requires the applicant to inform all students not to loiter or <br /> make loud noises outside the building before or after classes. Therefore, it is unlikely the <br /> noise produced by the proposed use will adversely affect adjacent tenant spaces or be in <br /> excess of 70 dBA at any point outside of the property plane as prescribed by the Municipal <br /> Code. <br /> ALTERNATIVES <br /> As outlined in the above analysis staff believes the use, as proposed and conditioned, would <br /> be compatible with the other uses in the vicinity and not create adverse impacts, and <br /> recommends the Planning Commission approve the project as proposed and conditioned. <br /> However, alternatives to the proposal that could be considered by the Planning Commission <br /> include: <br /> 1. Denial of the application, therefore not allowing a tutoring facility to be operated at the <br /> subject site; or <br /> 2. Approval of the application with modified hours, number of tutoring sessions, number of <br /> students, etc. <br /> SUMMARY OF PROS/CONS OF PROJECT <br /> PROS CONS <br /> Use is consistent with the General Plan and The proposal may increase traffic and <br /> zoning designation. parking demand; however, traffic/circulation <br /> and parking impacts would not be adverse. <br /> Provides educational services for children. <br /> Allows for operation of a new local business <br /> and tutoring center. <br /> PUBLIC NOTICE AND COMMENTS <br /> Notices of this application were sent to surrounding property owners and tenants within a <br /> 1,000-foot radius of the site. At the time this report was published, staff has not received any <br /> public comments about the project. <br /> P19-0008, 5200 Franklin Drive Planning Commission <br /> 10 of 11 <br />pproval which allows the Director of Community <br /> P19-0008, 5200 Franklin Drive Planning Commission <br /> 9 of 11 <br />d plan that was prepared <br /> for the proposed use. The tenant space was previously occupied by a heritage school which <br /> had similar pickup times and did not generate traffic conflicts (the prior heritage school <br /> provided transportation to pick up students from local schools). Staff has determined that the <br /> proposed hours of operation and the associated number of attendees would not have a <br /> significant impact on existing traffic levels. However, should the applicant wish to increase the <br /> P19-0008, 5200 Franklin Drive Planning Commission <br /> 7of11 <br />ist will identify where hand <br /> excavation may be required. Motorized equipment shall not be used within the TREE <br /> PROTECTION ZONE. <br /> 3. Prior to excavation for the demolition and construction the tree may require root pruning <br /> outside the TREE PROTECTION ZONE by cutting all roots cleanly to the depth of <br /> construction. Roots will be exposed by either: pulling soil away from the tree by digging <br />, normally 54"above grade. A multi-branched tree, which has <br />