My WebLink
|
Help
|
About
|
Sign Out
02
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
ECONOMIC VITALITY
>
AGENDA PACKETS
>
2019
>
041819
>
02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2019 12:02:22 PM
Creation date
4/15/2019 3:05:31 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/18/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
permanently -protected open space and three parcels for the new single-family <br />residences). <br />• Status Approved <br />• Next Steps/Details: Approved by City Council on Aug. 16, 2016. <br />Improvement plans have been submitted to the City for <br />review and approval. <br />• Applicant: Guy HoustonNalley Capital Realty <br />• Staff Contact(s): Jennifer Hagen <br />20. 2350 Santa Rita Rd.I Other <br />PUD -125 Carpenters Training Center Redevelopment <br />Application for a Planned Unit Development (PUD) development plan to demolish the <br />existing 67,000 -square -foot building and construct a new 87,000 -square -foot two-story <br />Carpenter's Training Center. <br />• Status Under Construction <br />• Next Steps/Details: Approved by City Council on May 15, 2018. Building and <br />Improvement plans have been approved and construction <br />is ready to begin. <br />• Applicant: Carpenter's Training Trust Fund <br />• Staff Contact(s): Jennifer Hagen <br />21. 4211-4299 Rosewood Dr.I Commercial <br />P16-1695 Rose Pavilion Shopping Center Renovations <br />Application for Design Review to remodel the facades, repaint the buildings, remove and <br />replace existing trees, and make minor alterations to the parking lot paving and striping at <br />Rose Pavilion. <br />• Status Under Construction <br />• Next Steps/Details: Approved by Zoning Adminstrator on Feb. 22, 2017. <br />Phase 1 is complete; Phase 2 is currently under <br />construction. <br />• Applicant: Brixmor <br />• Staff Contact(s): Jennifer Hagen <br />22. 1700 Stoneridge Mall Road Commercial <br />P18-0340 I Stoneridge Mall Road <br />Application for Design Review approval to demolish the existing Sears Department store <br />(approximately 177,930 -square -feet) and construct up to 258,000 -square -feet (80,070 - <br />square -feet of net increase) of new retail, cinema, specialty, and health club facility uses. <br />• Status Under Review <br />• Next Steps/Details: Planning Commission Workshop was held on February <br />27, 2019. The next Planning Commission hearing is <br />anticipated late April/early May 2019. <br />• Applicant: Simon Properties <br />• Staff Contact(s): Jennifer Hagen <br />Page 7 of 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.