My WebLink
|
Help
|
About
|
Sign Out
25
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2019
>
041619
>
25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2019 2:12:01 PM
Creation date
4/10/2019 1:02:28 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/16/2019
DESTRUCT DATE
15Y
Document Relationships
25 ATTACHMENT 2e
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2019\041619
25 ATTACHMENT 4
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2019\041619
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Landscape Architect <br /> 39. Detailed landscape and irrigation plans encompassing all planting areas, both on-site <br /> and off-site, must be included in the building permit plans. All plans shall be prepared by <br /> a licensed landscape architect and shall provide the species, location, size, quantities, <br /> and spacing of all plants. Minimum plant sizes are 1-gallon containers for ground cover, <br /> 5-gallon for shrubs, and 15 gallon for trees. Plant species shall be of a drought-tolerant <br /> nature and the irrigation design shall utilize low-volume drip, bubbler, or other water <br /> conserving irrigation systems to the maximum extent possible. The drawings shall be <br /> reviewed and approved by the City's Landscape Architect prior to building permit <br /> issuance and Chabad of Tri-Valley operation under this conditional use permit approval. <br /> 40. The project shall comply with the City of Pleasanton's Water Efficient Landscape. <br /> Ordinance (WELO) and Bay Friendly Basics Landscape Checklist. The applicant shall <br /> submit a Landscape Documentation Package in PDF format to the City's Landscape <br /> Architect Division, which shall be reviewed and approved by the City's Landscape <br /> Architect prior to issuance of building permits. The Landscape. Documentation Package <br /> shall include: <br /> a. Project Information; <br /> b. Water Efficient Landscape Worksheet; <br /> c. Soil management report; <br /> d. Landscape design plan; and <br /> e. Irrigation design plan. <br /> 41. Upon completion of construction and prior to final inspection by the Building and Safety <br /> Division, the applicant's landscape architect shall submit a Certificate of Completion <br /> Package in PDF format to the City's Landscape Architect Division for review and <br /> approval. The Certificate of Completion Package shall include: <br /> a. Project information sheet; <br /> b. Certificate of installation according to the landscape documentation package; <br /> c. Irrigation scheduling; <br /> d. Schedule of irrigation landscape and irrigation maintenance; <br /> e. Landscape irrigation audit report; and <br /> f. Soil management report (if not previously submitted). <br /> 42. Prior to Chabad of the Tri-Valley beginning operation under this conditional use permit <br /> approval building permit final, all landscaping shall be installed, reviewed, approved, <br /> and inspected by the Landscape Architect Division. <br /> STANDARD CONDITIONS OF APPROVAL <br /> Community Development Department <br /> 43. To the extent permitted by law, the project applicant shall defend (with counsel <br /> reasonably acceptable to the City), indemnify and hold harmless the City, its City <br /> Council, its officers, boards, commissions, employees and agents from and against any <br /> claim (including claims for attorneys fees), action, or proceeding brought by a third party <br /> P16-1883 and P16-0288, 3370 Hopyard Road Conditions of Approval <br /> Page.6 of 9. <br />
The URL can be used to link to this page
Your browser does not support the video tag.