My WebLink
|
Help
|
About
|
Sign Out
03
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2019
>
041619
>
03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2019 2:11:20 PM
Creation date
4/10/2019 12:21:13 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/16/2019
DESTRUCT DATE
15Y
Document Relationships
03 ATTACHMENT 2a
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2019\041619
03 ATTACHMENT 2a1
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2019\041619
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f. Construct bike lanes, driveways, and/or uncovered parking lots with permeable surfaces. <br /> 54. STATE OF CALIFORNIA CONSTRUCTION GENERAL PERMIT: A "Notice of Intent" (NOI) and <br /> "Stormwater Pollution Prevention Plan" (SWPPP) shall be prepared for construction projects <br /> disturbing 1 acre or more of land (including smaller sites that are part of a larger common plan of <br /> development). The applicant shall include the Waste Discharger Identification Number (WDID) on <br /> the title sheet of the improvement plans and provide proof of coverage under the State of <br /> California Construction General Permit to the Engineering Department prior to the approval of the <br /> improvement plans by the Director of Engineering/City Engineer. <br /> 55. STORMWATER POLLUTION PREVENTION PLAN: The applicant shall submit one hard copy <br /> and one PDF copy of the Stormwater Pollution Prevention Plan (SWPPP) for review and <br /> acceptance by the Director of Engineering/City Engineer prior to issuance of a building or <br /> engineering permit, whichever occurs first. A hard copy of the City-accepted SWPPP shall be <br /> available at the project site until all work is complete and engineering and building permits have <br /> been finaled. A site specific SWPPP shall be combined with proper and timely installation of the <br /> Best Management Practices, thorough and frequent inspections, maintenance, and <br /> documentation. Failure to comply with the reviewed construction SWPPP may result in issuance <br /> of correction notices, citations, or a stop work order. <br /> FIRE DEPARTMENT— 925-454-2361 <br /> The Fire Prevention Bureau reviews building/civil drawings for conceptual on-site fire mains and fire <br /> hydrant locations only. Plan check comments and approval DO NOT include: 1.) Installation of the on- <br /> site fire mains and fire hydrants. Specific installation drawings submitted by the licensed underground fire <br /> protection contractor shall be submitted to the Fire Prevention Bureau for approval; and 2.) Backflow <br /> prevention or connections to the public water mains. <br /> 56. The Fire Department turn-around on the current site plan at the driveway approach is required <br /> and shall not be modified unless approved by the Fire Marshall. (PROJECT SPECIFIC <br /> CONDITION) <br /> 57. FIRE HAZARDS: The project developer shall keep the site free of fire hazards from the start of <br /> lumber construction until the final inspection. <br /> 58. FIRE CODE: All construction shall conform to the requirements of the 2016 Pleasanton Fire <br /> Code and local ordinances. All required permits shall be obtained prior to work commencement. <br /> 59. SITE SAFETY: Site safety during construction shall be in accordance with Fire Code chapter 33. <br /> 60. FIRE SPRINKLERS: Automatic fire sprinklers shall be installed in all occupancies in accordance <br /> with the 2016 Pleasanton Building, Fire and Residential Codes with local amendments and <br /> ordinances. <br /> 61. HAZARDOUS MATERIALS: Should any operation or business activity involve the use, storage or <br /> handling of hazardous materials, the firm shall be responsible for contacting the Livermore- <br /> Pleasanton Fire Department prior to commencing operations. Please contact the Hazardous <br /> Materials Coordinator at 925/454-2361. <br /> 62. EMERGENCY VEHICLE ACCESS ROADS: Access roads (i.e., the driveway to the existing <br /> garage) shall have 13 feet, 6 inches unobstructed vertical clearance, 20 feet of unobstructed <br /> width (26 feet where occupied building floors exceed 30 feet height), and inside turning radius of <br /> PUD-131 <br /> Page 9 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.