Laserfiche WebLink
Item Structural Upgrades - 1 st Floor Level <br />00001 <br />Replace existing stair/landing at southwest corner <br />1 <br />EA <br />$4,000.00 <br />$4,000.00 <br />00002 <br />Replace (3) Stairs & Landings <br />3 <br />EA. <br />$2,000.00 <br />$6,000.00 <br />00003 <br />Add 1/2" CD -X Plywood to Fnd Stem wall <br />124 <br />LF <br />$100.00 <br />$12,400.00 <br />00004 <br />18"x18" Cont. Ftg. Below Corridor Walls w/ <br />52 <br />LF <br />$750.00 <br />$39,000.00 <br />00005 <br />2x6 Cripple Wall w/ Plywood below Corridor Walls <br />2 <br />EA <br />$3,000.00 <br />$6,000.00 <br />00005 <br />Add 1/2" CD -X plywood sill bolts and "A35's" <br />72 <br />LF <br />$250.00 <br />$18,000.00 <br />00006 <br />New 6x6 post with 12x12x18"D Footing <br />16 <br />EA <br />$1,000.00 <br />$16,000.00 <br />00007 <br />New Simpson "128T" beam -post ties <br />9 <br />EA <br />$200.00 <br />$1,800.00 <br />New 3/8" CD -X plywood shear (at inside of walls) <br />1,050 <br />SF <br />$30.00 <br />$31,500.00 <br />Item Structural Upgrades - 2nd Floor Level <br />00001 <br />Add "HL53" angles ea. side of 06 post <br />22 <br />EA <br />$75.00. <br />$1,650.00 <br />00002 <br />Add Simpson "HL53" angle ea. side of post <br />4 <br />EA <br />$75.00. <br />$300.00 <br />00003 <br />Add Simpson "DTT2Z" anchors w/ Blk'g <br />14 <br />EA <br />$250.00. <br />$3,500.00 <br />00004 <br />Replace roof/plywood at small porch NW Comer <br />1 <br />LS <br />$1,000.00 <br />$1,000.00 <br />00005 <br />Straplfie Brick'Fireplace at filoor & roof <br />2 <br />EA <br />$3,000.00 <br />$6,000.00 <br />New 3/8" CD -X plywood shear (at inside of walls) <br />920 <br />SF <br />$30.00 <br />$27,600.00 <br />Total <br />$168,750.00 <br />