My WebLink
|
Help
|
About
|
Sign Out
04 ATTACHMENT 1
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PARKS AND RECREATION
>
2019
>
041119
>
04 ATTACHMENT 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2019 12:53:08 PM
Creation date
4/5/2019 1:27:40 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/10/2019
Document Relationships
04
(Message)
Path:
\BOARDS AND COMMISSIONS\PARKS AND RECREATION\2019\041119
11
(Superseded by)
Path:
\BOARDS AND COMMISSIONS\PARKS AND RECREATION\2019\041119
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
JKAARCHITECTURE <br />6353 Dol Cerro Slvo. San DiaBa, CA 92728 I www.lollkatzarehllacluro.com 1818.898.8777 <br />SECT DESCRIPTION <br />PLEASANTON CENTURY HOUSE - <br />SCHEMATIC DESIGN COST ESTIMATE <br />QUANTITY UNIT UNIT COST TOTAL <br />QP ION 1: SYSTEMS ESTIMATE <br />LS <br />6650.00 <br />$ <br />6,650.00 <br />25. <br />700 <br />PLUMBING SYSTEM <br />LS <br />6650.00 <br />$ <br />6,650.00 <br />26. <br />1. <br />PLUMBING FIXTURE DEMOLITION <br />11 <br />EA <br />250.00 <br />$ <br />2,750.00 <br />2. <br />PLUMBING PIPING DEMOLITION <br />1500 <br />LF <br />3.74 <br />$ <br />5,610.00 <br />3. <br />NEW WATER CLOSETS <br />3 <br />EA <br />2500.00 <br />$ <br />7,500.00 <br />4. <br />NEW LAVATORY SINK & FAUCET <br />4 <br />EA <br />1500.00 <br />$ <br />6,000.00 <br />5. <br />NEW URINAL <br />1 <br />EA <br />1500.00 <br />$ <br />1500.00 <br />6. <br />NEW KITCHEN SINK <br />1 <br />EA <br />1600.00 <br />$ <br />1,600.00 <br />7. <br />NEW GARBAGE DISPOSAL <br />1 <br />EA <br />500.00 <br />$ <br />500.00 <br />8. <br />NEW WATER HEATER <br />1 <br />EA <br />4200.00 <br />$ <br />4,200.00 <br />.9. <br />NEW FLOOR SINK <br />1 <br />EA <br />2500.00 <br />$ <br />2,500.00 <br />10. <br />NEW MOP SINK & FAUCET <br />1 <br />EA <br />1800.00 <br />$ <br />1,800.00 <br />11. <br />NEW DUPLEX SUMP PUMP, VALVES, & CONTROLS <br />1 <br />EA <br />5600.00 <br />$ <br />5,600.00 <br />12. <br />BALLVALVES <br />7 <br />EA <br />100.00 <br />$ <br />700.00 <br />13. <br />TRAP PRIMERS <br />2 <br />EA <br />200.00 <br />$ <br />400.60 <br />.14. <br />COPPER PIPING (WATER & CONDENSATE) <br />1000 <br />LF <br />25.00 <br />$ <br />25,000.00 <br />15. <br />BLACK STEEL PIPING (GAS) <br />200 <br />LF <br />20.00 <br />$ <br />4,000.00 <br />16. <br />ABS TYPE DWV (WASTE & VENT) <br />500 <br />LF <br />61.00 <br />$ <br />30,500.00 <br />17. <br />PIPE INSULATION (HOT & COLD) <br />1500 <br />LF <br />13.50. <br />$ <br />20,250.00 <br />18. <br />CAMERA, INSPECT, HYDROJET REPAIR - LINE TO STREET <br />1 <br />LS <br />5000.00 <br />$ <br />5,000.00: <br />19. <br />PIPE HANGERS <br />150 <br />EA <br />65.50 <br />$ <br />9,825.00' <br />20. <br />FLEX CONNECTORS <br />15 <br />EA <br />13.50 <br />$ <br />202.50 , <br />21. <br />MIXING VALVE <br />1 <br />EA <br />1625.00. <br />$ <br />1,625.00 <br />22. <br />HOSE BIBBS WITH VACUUM BREAKERS <br />4 <br />EA <br />475.00 <br />$ <br />1,900.00 <br />23. <br />CONDENSATE PUMP <br />2 <br />EA <br />600.00 <br />$ <br />1.200.00 <br />24. <br />(ALLOWANCE) WATER TAP TO STREET <br />1 <br />LS <br />6650.00 <br />$ <br />6,650.00 <br />25. <br />(ALLOWANCE) WASTE TAP TO STREET <br />1 <br />LS <br />6650.00 <br />$ <br />6,650.00 <br />26. <br />(ALLOWANCE) REPLACE LATERAL TO STREET W/ BACKFILL & TRECNH <br />300 <br />LF <br />36.15 <br />$ <br />10,845.00 <br />27. <br />(ALLOWANCE) STREET CONNECTION - SEWER <br />1 <br />LS <br />6650.00 <br />$ <br />6,650.00 <br />28. <br />(ALLOWANCE) WATER PIPE TO STREET W/ BACKFILL &TRENCH <br />300 <br />LF <br />35.00 <br />$ <br />10,500.00 <br />29. <br />(ALLOWANCE) ADDED PLUMBING FIXTURES & PIPING <br />1 <br />LS <br />50000.00 <br />$ <br />50,000.00 <br />ALLOWANCE SUB -TOTAL :.:.: .� ...->.::..: ...... ........::.. <br />. �. ... <br />- ,. <br />.::b. .91;295.00 <br />TOTAL 700 <br />$. <br />231,457:50 <br />POWAY SWIM CENTER - DESIGN DEVELOPMENT COST ESTIMATE <br />
The URL can be used to link to this page
Your browser does not support the video tag.