Laserfiche WebLink
Pleasanton Century House Assessment Report <br />March 30, 2019 <br />Page 3 <br />9. Repainting of interior surfaces <br />10. Replacement of all flooring finishes <br />11. Removal of any lead or asbestos containing materials <br />12. Replacement of all kitchen equipment and casework <br />13. Modifications to existing windows to either -repair glides if operable windows are <br />desired, or to fix windows if non-operable is desired. <br />14. Replacement of door hardware to all lever style handles and city standard locksets <br />15. Interior stair modifications to meet current code requirements <br />16.Assessment of exiting from the second level as determined by proposed function of <br />second level <br />17. Installation of an elevator to provide compliant access to the second floor <br />(dependent on proposed use). <br />18. Renovation of restrooms to provide compliant facilities <br />19. Modifications and upgrades as required for fire extinguishing, alarm and / or <br />sprinkler systems <br />20. Modifications to second floor spaces due to inadequate head height in some spaces. <br />21. Potential code upgrades to wall rating systems as determined by occupant load of <br />planned use. <br />22. Railing replacement of second floor stair railing to meet current code requirements <br />(spacing between balusters) <br />Much of the required interior modifications will be required regardless of planned use of the <br />facility. Some proposed functions will add additional requirements to the scope of work. <br />For example, if the building is revised to an assembly occupancy, there will be additional <br />requirements for fire protection systems, and potential additional improvements for the wall <br />construction. Without a detailed program for proposed uses it is difficult to list all <br />improvements required. For the sake of this assessment it is assumed that the facility will <br />be used for public functions of limited occupancy and that all areas must be brought into <br />compliance for accessibility. <br />Finishes proposed for the remodeled area include painted gypsum board walls (removal of <br />existing wallpaper is recommended) and ceilings and hard surface flooring (vinyl tile or <br />refinished wood flooring as appropriate). A material and color board will be prepared.with <br />options for final selection during the design development phase of the project. The <br />restrooms will be provided with appropriate tile wall and floor finishes. <br />Structural <br />The existing structural system is one of the most problematic aspects of this existing <br />building. -The findings of our analysis are: <br />1. The small covered wood deck at the southwest corner, shows signs of deterioration <br />and the existing framing has shims that make it unstable. <br />28o Settencourt Street, Sonoma, CA 95476 <br />www jeffkatzarchitecture.com <br />