Laserfiche WebLink
Summary <br /> Projected net growth of 301 TK-5 students, 280 6-8 and 294 9-12 through 2025 (most of it in <br /> the north) <br /> The northern portion of the District is expected to remain impacted; new school should help <br /> Board approved (Dec. 2018) a ES #10 to be only 4-5, in current Donlon ES boundary (Donlon K-3) by 2023 <br /> The maturation projections show the need to house 7,900 TK-5 students <br /> (2 additional sites; ES#10 is one of them) <br /> It is important for the District to continue to monitor future development plans and <br /> demographic trends <br /> Since FMP calls for middle schools to not exceed 1 ,200 students, then other means to house <br /> additional 6-8 students needs to be addressed by possible expansion of existing sites <br /> No need for any additional high schools <br /> EIDYIIS Page 28 of 30 <br /> DEMOGRAPHICS <br />