My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
ECONOMIC VITALITY
>
AGENDA PACKETS
>
2019
>
032119
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2019 12:01:09 PM
Creation date
3/18/2019 8:31:58 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/21/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
■ Restaurants: 186 parking spaces (same as above). <br />■ Cinema: 167 parking spaces (same as above). <br />■ Lifestyle Fitness Center: To be determined <br />As stated above, parking requirements for the proposed fitness center use are not listed within <br />the PMC and therefore are considered on a case-by-case basis. Staff has requested a <br />site- specific parking study for the proposed development including the fitness center to <br />determine its parking demand. The parking study will be presented to the Planning <br />Commission with staff's recommendation at a future public hearing. <br />Architecture <br />The Stoneridge Mall is visually defined by the architecture of its department stores, with the <br />central mall building functioning as their "backdrop." All of the mall's department stores employ <br />a combination of the following features in their designs: <br />■ Building design elements have substantial vertical and horizontal plane changes <br />creating a "sculptured" appearance. <br />■ The predominant building material is a warm -toned, cream -colored brick applied in <br />various patterns, e.g., running -bond, stacked bond, Flemish bond, soldier course, etc. <br />• Building entries are defined by projections, canopies, raised landscape planters, etc. <br />• Landscape planters located between the buildings and sidewalks functioning as the <br />"building base" for the mall and providing a pedestrian scaled element along the <br />sidewalk areas. <br />The new development will provide modernized mall design standards that will continue to <br />provide defined projections, canopies, and entry features as shown in elevation examples in <br />Figure 5. For complete elevations please see Exhibit B. The various building entrances will be <br />two stories tall leading to an entrance lobby and are further distinguished by being recessed <br />and curved. Stucco, patterned brick treatments with wood and metal accents, as well as <br />detailing, and banding will be integrated into building walls as separate components, thereby <br />creating variation and interest in the wall surfaces. <br />As proposed, the buildings will vary in height with Retail Buildings A and B approximately <br />50 -feet tall, Retail Building C approximately 40 -feet tall, the Grocery/Cinema Building <br />approximately 62 -feet tall, and the lifestyle fitness facility approximately 65 -feet tall. All <br />buildings would be less than the 68 -foot maximum height of existing mall buildings. Substantial <br />landscape areas are provided along Stoneridge Mall Road as well as within the interior <br />courtyard areas creating a "green" base for the buildings consistent with the existing shopping <br />center. While following a more modern standard design, the development has been designed <br />to complement the mall's existing design program. Additional photo simulations for the site will <br />be presented to the Planning Commission with staff's recommendation at a future public <br />hearing. <br />P18-0340, Stoneridge Shopping Center Planning Commission <br />10 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.