Laserfiche WebLink
have the Wye-Strainers installed within two months — prior to the onset of hot summer <br /> temperatures and the heavy irrigation season. <br /> GSE proposed a total cost for all seven locations of $203,800. This price includes <br /> purchasing and installing all necessary parts. Staff believes the cost to be fair and <br /> reasonable based upon the cost estimate prepared in-house for the work. It is <br /> recommended that City Council allocate $220,000 from Fund 518 for the work, and <br /> authorize the Director of Engineering to process change orders up to allocated amount <br /> to complete the work. While it is anticipated that the total cost will be $203,800 as <br /> proposed by GSE, the allocation and authorization of$220,000 includes an additional <br /> $16,200 to cover any unforeseen conditions discovered while excavating the existing <br /> recycled water piping at each of the seven installation locations. <br /> Submitted by: Fisch R view: Approve by: <br /> /// <br /> Stephen Kirkpatrick Tina Olson Nelson Fialho <br /> Director of Engineering Director of Finance City Manager <br /> Attachment: <br /> 1. Strainer Diagram <br /> Page 3 of 3 <br />