My WebLink
|
Help
|
About
|
Sign Out
05
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2019
>
031919
>
05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2019 4:18:12 PM
Creation date
3/14/2019 4:18:10 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/19/2019
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DYETT & BHATIA <br /> Urban and Regional Planners <br /> For locations where significant impacts are identified, we will evaluate the effectiveness of <br /> mitigation measures. In addition to the intersection analysis described above,we will also update <br /> the vehicle miles of travel assessment. <br /> Fehr & Peers will update the transportation and circulation section of the Administrative Draft <br /> Environmental Document, as well as the applicable sections of the Alternatives chapter. We will <br /> respond to one round of editorial comments prior to finalizing our work. <br /> 3.2 Air Quality and GHG Emissions Modeling Update <br /> Based on updated traffic data from Fehr & Peers, D&B will use CalEEMod to revise estimates <br /> emissions of ozone precursors(reactive organic gases[ROGs] and nitrogen oxides[NOX]),carbon <br /> monoxide(CO),and inhalable particulate matter(PM10 and PM2.5)emitted by vehicles operated <br /> on study area roadways for future buildout conditions. Additionally, D&B will use the updated <br /> traffic input to revise the analysis of greenhouse gas(GHG) emissions, including carbon dioxide, <br /> (CO2), methane (CH4) and nitrous oxide (N20), that will be generated from Specific Plan <br /> implementation. D&B will also update the tables, text and figures in the Air Quality and GHG <br /> Emissions Chapters of the Screencheck Draft EIR to reflect updated air quality and GHG emissions <br /> modeling. <br /> 3.3 Noise Modeling Update <br /> Based on updated traffic data from Fehr & Peers, CSA will revise traffic noise calculations and <br /> provide one updated noise contour map for"future"conditions. D&B will update the tables,text <br /> and figures in the Noise Chapter of the Screencheck Draft EIR to reflect updated noise analysis and <br /> mapping from CSA. <br /> 3.4 Screencheck Draft EIR II Preparation and Update of Notices <br /> This task involves updates to the Summary, Introduction, Project Description, Environmental <br /> Analysis, and Alternatives Chapters of the Screencheck Draft EIR needed to reflect the updates <br /> modeling results described above.Additionally,includes time for D&B staff to format and PDF the <br /> Screencheck Draft EIR II submittal and to revised the NOA and NOC. <br /> Task 5: Evaluation of Minor Land Use and Zoning Changes <br /> Subsequent to the release of the public review Draft DSP EIR,the City is considering requests from <br /> two property owners in the downtown area for a change to current land use designations to allow <br /> residential development. Both sites are developed with some existing uses (one a restaurant and <br /> existing home;the other a gas station and auto repair business),which would be demolished and <br /> replaced with residential uses.The City is also considering some other minor zoning changes as a <br /> result of public review.An initial review of the proposed developments indicates that the proposed <br /> changes would result in a small net reduction in peak hours trips to/from the sites in question, <br /> although there would be a net increase in the number of residents and housing units in the DSP <br /> area in 2040. <br /> 1330 Broadway Ste.604 Oakland,CA 94612 <br /> 415 956 4300 I www.dyettandbhatia.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.