My WebLink
|
Help
|
About
|
Sign Out
06
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2019
>
021919
>
06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2019 4:40:20 PM
Creation date
2/13/2019 2:41:35 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/19/2019
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appellants Proposed Revisions <br /> Millers: <br /> No changes to the proposed use of the buffer area were suggested. <br /> Chabad: <br /> Chabad has identified several possible uses that should potentially be allowed, or may <br /> be proposed in the future, that it is concerned would be precluded by Condition No. 5. <br /> These include: <br /> • Informal use of the area for occasional, limited activities such as a children's <br /> scavenger hunt <br /> • Installation of a "biblical garden" or "contemplation garden" <br /> • Installation of storage sheds <br /> • Future construction of a residence for the Rabbi and his family. <br /> Staff Analysis/Response <br /> Staff believes that some additional, passive use of the buffer area for enclosed storage <br /> would be appropriate and reasonable. However, other uses such as a contemplation <br /> garden or other more active uses have not been defined at this time, and as such, staff <br /> does not recommend they be included as part of this Use Permit approval. A future <br /> application to modify the Use Permit could be submitted by Chabad if they wished to <br /> broaden the scope of allowed uses, or to allow an entirely new use, such as a <br /> residence. Condition of Approval No. 5 has been modified to allow for up to three <br /> storage sheds no greater than 120 square feet in size to be placed in the buffer area, <br /> set back at least 10 feet from the property line. <br /> St. Clare's Episcopal Church Letter <br /> On September 28, 2018, staff received a letter from St. Clare's Episcopal Church (dated <br /> September 2, 2018) stating concerns with respect to execution of their approved master <br /> plan for expansion; and concerning use of a shared trash enclosure. (Attachment 3). <br /> Parking/Development Under Approved Master Plan <br /> The September 2 letter notes that the construction of Chabad's proposed outdoor patio <br /> and playground would affect the ability to access and construct a proposed shared <br /> parking lot located between the two facilities. <br /> In June 2005, on appeal, the City Council approved Case PAP-79/PCUP-118/PDR-391, <br /> a Conditional Use Permit and Design Review for the St. Clare's master expansion <br /> project, to be carried out in three phases. Phase I has been constructed. Phases II and <br /> III, which have yet to be built, require nine additional parking spaces to be provided, for <br /> a total of 75 spaces split between two parking areas, a 45-space lot to the east of St. <br /> Clare's, and a 30-space lot to the southwest of the (now) Chabad building, connected <br /> by an access driveway. The parking lot was to have been shared between the two <br /> users. <br /> Page 9 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.