My WebLink
|
Help
|
About
|
Sign Out
06
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2019
>
021919
>
06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2019 4:40:20 PM
Creation date
2/13/2019 2:41:35 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/19/2019
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. Any changes to the proposed phasing of the project shall be submitted for the review <br /> and approval of the Planning Director. Said request shall demonstrate that sufficient <br /> parking would be available on-site for the facility and approved uses on the site. <br /> 8. The project developer shall revise the proposed master expansion plan to show that <br /> no portion of the building will encroach into the required setback area. A revised site <br /> plan shall be submitted for the review and approval of the Planning Director prior to <br /> issuance of a building permit. <br /> 9. The project developer shall submit a recordable agreement between St. Clare's <br /> Episcopal Church and Masonic Lodge for the construction and use of the extended <br /> parking lot during Phase II expansion review. This agreement shall be reviewed and <br /> approval of the City Attorney's Office prior to issuance of building permits for <br /> Phase II. <br /> 10. This approval does not include the expansion of the existing preschool program. In <br /> the event that existing preschool program is proposed to be expanded,a separate <br /> conditional use permit shall be required. At that time,a traffic study and noise <br /> analysis shall be submitted as part of the use permit application. <br /> 11. Prior to the issuance of a building permit for Phase I,the project developer shall <br /> provide window details for review and approval by the Planning Director. The details <br /> shall show a two-inch window recess from the building wall. <br /> 12. The project developer shall install an attractive open,painted metal fence, with <br /> integrated landscaping to replace the existing chain link fence located around the pre- <br /> school area. The details of the landscaping and the fence design are subject to the <br /> review and approval of the Planning Director. The fence and landscaping shall be <br /> installed as a part of the Phase I developments. <br /> 13. All conditions of approval for this case shall be written by the project developer on all <br /> building permit plan check sets submitted for review and approval. These conditions <br /> of approval shall be on, at all times, all grading and construction plans kept on the <br /> project site. It is the responsibility of the building developer to ensure that the project <br /> contractor is aware of, and abides by, all conditions of approval. It is the <br /> responsibility of the building developer to ensure that the project landscape contractor <br /> is aware of, and adheres to, the approved landscape and irrigation plans. Prior <br /> approval from the Planning Department must be received before any changes are <br /> constituted in site design, grading,building design, building colors or materials, <br /> landscape material, etc. <br /> 14. Prior to issuance of a building permit for Phase I, the project developer shall pay the <br /> applicable Zone 7 and City connection fees and water meter cost for any water <br /> meters, including irrigation meters. Additionally, the project developer shall pay any <br /> applicable Dublin San Ramon Services District (DSRSD) sewer permit fee. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.